- Stage 6 built · Stage 7 next
+ All stages built · gate passed
Demonstrator, not a product
Meridian Archipelago — engineered fiction
diff --git a/docs/status.yml b/docs/status.yml
index 168a753..557d35c 100644
--- a/docs/status.yml
+++ b/docs/status.yml
@@ -13,10 +13,10 @@
# the site polices its own optimism rather than trusting a human to.
# - Nothing here may show a capability the repository does not contain.
-updated: 2026-07-16
+updated: 2026-07-18
current_stage: 7 # 0..7, the stage in flight
-current_stage_label: "Stage 6 built · Stage 7 next"
-gate_passed: false # the spine-complete gate (SPEC-15)
+current_stage_label: "All stages built · gate passed"
+gate_passed: true # the spine-complete gate (SPEC-15) — tests/gate.test.ts, green in CI
stages:
- id: 0
@@ -64,7 +64,7 @@ stages:
- id: 7
name: Surfaces & narratives
blurb: role bundles + five narrative scripts (post-gate)
- status: not-started
+ status: done
research_note: docs/research/09-narratives.md
research_published: true
@@ -97,6 +97,16 @@ theses: # state vocabulary is the register's own
# The dated updates feed — newest first. A milestone entry may stay a one-liner
# or grow into a full blog article (see `blog:` below and comms plan §6/§9).
updates:
+ - date: 2026-07-18
+ note: >-
+ Site-currency correction (DEC-28 — under-reporting is drift too): the stage tracker and Home
+ badge still said "Stage 6 built · Stage 7 next" and gate_passed: false, while Stage 7
+ (surfaces & narratives, SPEC-16/17 — since rebuilt on the SPEC-26 replay mechanism) has been
+ built and demonstrated, and the SPEC-15 spine-complete gate harness (tests/gate.test.ts,
+ asserting G1–G6 end-to-end on Meridian plus the vignette §9 oracles) has been implemented and
+ green in CI since it landed. Corrected: stage 7 done, gate_passed true, badge "All stages
+ built · gate passed"; the SPEC-15 spec status line updated to match. No capability change —
+ this entry records the site catching up with the repository, in both directions of honesty.
- date: 2026-07-18
note: >-
Register batch 9 ratified (ASSAY-DEC-48/49/50, closing concept §6.30/§6.31/§6.35) — the
diff --git a/specs/015-gate/spec.md b/specs/015-gate/spec.md
index 8503950..eafeaa8 100644
--- a/specs/015-gate/spec.md
+++ b/specs/015-gate/spec.md
@@ -4,7 +4,7 @@
**Created**: 2026-07-14
-**Status**: Draft
+**Status**: Built — the gate harness ships as `tests/gate.test.ts` (asserts G1–G6 end-to-end on Meridian, re-asserts the vignette §9 oracle cases O-1…O-4, confirms theses A–F walkable) and runs green in CI; recorded as passed in `docs/status.yml` (`gate_passed: true`, 2026-07-18)
**Input**: SPEC-15 — Spine-complete gate harness; the single barrier before Stage 7.