diff --git a/docs/assay-home.html b/docs/assay-home.html index d360d36..398a6bf 100644 --- a/docs/assay-home.html +++ b/docs/assay-home.html @@ -236,7 +236,7 @@
- Stage 6 built · Stage 7 next + All stages built · gate passed Demonstrator, not a product Meridian Archipelago — engineered fiction
diff --git a/docs/status.yml b/docs/status.yml index 168a753..557d35c 100644 --- a/docs/status.yml +++ b/docs/status.yml @@ -13,10 +13,10 @@ # the site polices its own optimism rather than trusting a human to. # - Nothing here may show a capability the repository does not contain. -updated: 2026-07-16 +updated: 2026-07-18 current_stage: 7 # 0..7, the stage in flight -current_stage_label: "Stage 6 built · Stage 7 next" -gate_passed: false # the spine-complete gate (SPEC-15) +current_stage_label: "All stages built · gate passed" +gate_passed: true # the spine-complete gate (SPEC-15) — tests/gate.test.ts, green in CI stages: - id: 0 @@ -64,7 +64,7 @@ stages: - id: 7 name: Surfaces & narratives blurb: role bundles + five narrative scripts (post-gate) - status: not-started + status: done research_note: docs/research/09-narratives.md research_published: true @@ -97,6 +97,16 @@ theses: # state vocabulary is the register's own # The dated updates feed — newest first. A milestone entry may stay a one-liner # or grow into a full blog article (see `blog:` below and comms plan §6/§9). updates: + - date: 2026-07-18 + note: >- + Site-currency correction (DEC-28 — under-reporting is drift too): the stage tracker and Home + badge still said "Stage 6 built · Stage 7 next" and gate_passed: false, while Stage 7 + (surfaces & narratives, SPEC-16/17 — since rebuilt on the SPEC-26 replay mechanism) has been + built and demonstrated, and the SPEC-15 spine-complete gate harness (tests/gate.test.ts, + asserting G1–G6 end-to-end on Meridian plus the vignette §9 oracles) has been implemented and + green in CI since it landed. Corrected: stage 7 done, gate_passed true, badge "All stages + built · gate passed"; the SPEC-15 spec status line updated to match. No capability change — + this entry records the site catching up with the repository, in both directions of honesty. - date: 2026-07-18 note: >- Register batch 9 ratified (ASSAY-DEC-48/49/50, closing concept §6.30/§6.31/§6.35) — the diff --git a/specs/015-gate/spec.md b/specs/015-gate/spec.md index 8503950..eafeaa8 100644 --- a/specs/015-gate/spec.md +++ b/specs/015-gate/spec.md @@ -4,7 +4,7 @@ **Created**: 2026-07-14 -**Status**: Draft +**Status**: Built — the gate harness ships as `tests/gate.test.ts` (asserts G1–G6 end-to-end on Meridian, re-asserts the vignette §9 oracle cases O-1…O-4, confirms theses A–F walkable) and runs green in CI; recorded as passed in `docs/status.yml` (`gate_passed: true`, 2026-07-18) **Input**: SPEC-15 — Spine-complete gate harness; the single barrier before Stage 7.