Repository navigation
ElastOS Weekly Shipping Report — Week of October 23 – October 30, 2026 #1
SashaMIT
announced in
Announcements
Replies: 0 comments
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
Elacity Labs — Weekly Team Update for the World Computer Initiative (WCI)
October 23 – October 30, 2026
Runtime release train. The coming stable release kept moving on
developwith 229 commits this week. 0.8.0-alpha.25 was signed and went live on the canary channel on 27 October, Bangkok time (#93). 0.8.0-alpha.26 was signed from8a74b669cand went live on canary on 30 October. It is a canary alpha only. Installed-acceptance results for Jetson and Linux x86-64 were posted on #93. The release pull request tomainwas still open (PR 375),maindid not move, and nothing was on the stable channel as of 30 October 18:30 Bangkok time.developwas 2,013 commits ahead ofmain.Also on Runtime. You can now add someone as a contact by their DID, even with Discovery off. Discovery is renamed Public. Library shares a file only with your contacts: Share with contacts, Copy link and Stop sharing replace Publish. Chat's Community can post a Library file as a link. Documents keeps unsaved text and asks before it is lost. Services and Approval Lens are hidden for the stable release. The local content store now runs offline, and a Home serves a file only while it is shared and only to contacts.
Licence. The ElastOS launcher moved from AGPL-3.0 to the MIT licence (PR 60).
Elacity. CI across the marketplace and service repos gained secret scanning, dependency checks and actions pinned to commit SHAs. The marketplace API moved to Node.js 22.23.4 on its release branch and dropped the XMTP group chat on both release branches. The XMTP service was removed from the deployment setup. Everdroid, Android as an ElastOS capsule, got lower memory use and faster lazy reads.
Agent host lab. Lab work on running AI agents and apps as capsules on the ElastOS Runtime is now public under the MIT licence (elastos-agent-host-spike). It is work in progress. Ready parts fold into the main Runtime.
Key Links This Week
8a74b669cTable of Contents
1. The Big Picture — Two Signed Alphas on Canary
Last week the candidate was frozen and alpha.25 was qualified. This week alpha.25 and then alpha.26 were signed and went out on canary, and the team cut what the first stable release does not need.
8a74b669cand went live on the canary channel on 30 October (#93). It is a canary alpha only. It adds contacts by DID, sharing a Library file of up to 8 MiB with your contacts, Library files posted in Community Chat, People in three pages, Documents with Autosave off by default, and Chat unread dots that clear.PR 375, the release pull request, was still open at the end of this window. There was no stable tag and nothing on the stable channel. Later on 30 October, after this report's cutoff, the stable release was renamed from 0.8.0 to 2.0.0 and targeted for 2 November (#93). That release is covered in the next report.
Scope cuts for the stable release. Services is hidden from Home, Marketplace and System, and its requests belong to Inbox (e3d159f, 8441219). Approval Lens is hidden (9354777). The Apps & Services tab is gone from System (f30ba36). A fresh Home leaves out Services, WalletConnect, the content block graph and protected content until they are needed (ff14e25).
developgained 229 commits since the last report, none of them merges.mainhad no commits. No runtime pull requests merged or closed this week. Six opened.developwas 2,013 commits ahead ofmain.Agent host lab (in progress). The lab work on running AI agents and apps as capsules on the ElastOS Runtime is now public under the MIT licence (elastos-agent-host-spike). It is work in progress, not a release, and it does not replace the Runtime. Ready parts fold into the main Runtime; none had reached it this week. Its first milestone, M1, runs agents and apps as capsules: 23 of 30 checks were done as of 30 October 18:00 Bangkok time. Many of these checks are proved in the lab against a stand-in for the Runtime. The same checks on the real Runtime are tracked separately and stood at 0 of 14, as tracked then.
2. People, Sharing and Documents
Add a contact by DID.
People, Profile and Public.
Sharing with contacts.
Documents.
Also in the train.
3. Content, Carrier and Dependencies
4. Launcher and Licence
5. Marketplace and Protocol
6. Hyper, Hey-engine and Everdroid
7. Services and Sites
8. Installed Testing
9. What's Next
10. Summary
develop· alpha.25 and alpha.26 signed and live on canary · add a contact by DID · People, Profile and Public · Share with contacts · Community file links · Documents keeps unsaved text · Services and Approval Lens hidden · offline content store · 6 PRs opened ·develop2,013 ahead ofmainQuick fact card
8a74b669c) signed and live on canary 30 October (#93)developmainCadence: weekly updates. Previous report — Week of October 16 – October 23, 2026 (#49). This report — #1.
All reactions