Merge pull request #1 from devshift-stack/claude/analyze-repo-improve… #2
ci.yml
on: push
Matrix: test
security-scan
7s
integration-test
0s
Annotations
5 errors
|
test (3.11)
Process completed with exit code 1.
|
|
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
|
|
test (3.12)
Process completed with exit code 1.
|
|
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
|
|
test (3.10)
Process completed with exit code 1.
|