Merge pull request #4 from devshift-stack/feature/complete-react-setup #7
ci.yml
on: push
Matrix: test
security-scan
9s
integration-test
0s
Annotations
5 errors
|
test (3.12)
Process completed with exit code 1.
|
|
test (3.11)
The strategy configuration was canceled because "test._3_12" failed
|
|
test (3.11)
The operation was canceled.
|
|
test (3.10)
The strategy configuration was canceled because "test._3_12" failed
|
|
test (3.10)
The operation was canceled.
|