Skip to content

Commit dbe4026

Browse files
committed
FEATURE-ci-darwin-header-deadline: Mark diagnostic stage complete
1 parent 31ccbea commit dbe4026

1 file changed

Lines changed: 7 additions & 5 deletions

File tree

‎specs/tasks/FEATURE-ci-darwin-header-deadline.md‎

Lines changed: 7 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -1,7 +1,7 @@
11
# FEATURE-ci-darwin-header-deadline: Bounded native Darwin deadline diagnostic stage
22

3-
Status: In Progress — bounded diagnostic stage completed; documentation-only
4-
outcome awaits Groundwork validation and finalization. The defect is unresolved.
3+
Status: Complete — bounded diagnostic stage only. Groundwork validation passed
4+
(1 iteration, 0 fixed, 0 unworked); the defect and full CI gates remain unresolved.
55

66
Base: `v3` at `c0cfdabc8040273d60c610269a93d1c687ed8517`.
77

@@ -24,7 +24,7 @@ Acceptance for this diagnostic stage:
2424
- [x] Restore source, existing tests and workflows to exact base bytes; remove the temporary header.
2525
- [x] Preserve unresolved assertions/budgets, evidence and limits in a separate pending task.
2626
- [x] Verify documentation-only final delta and `git diff --check`.
27-
- [ ] Caller: Groundwork validation and serial task finalization.
27+
- [x] Caller: Groundwork validation and serial task finalization.
2828

2929
## Original failure remains open
3030

@@ -95,8 +95,10 @@ Cleanup evidence is in the primary checkout's
9595
`.debug/ci-darwin-native-69af4dxe/diagnostic-stage-cleanup.json` and
9696
`diagnostic-stage-cleanup-check.log`. Byte/blob equality, absent trace identifiers
9797
and the documentation-only diff were checked; `git diff --check` passes. With
98-
no production/test/workflow delta, no C++ build or broad suite was rerun. Final
99-
Groundwork audit and finalization remain caller-owned and pending.
98+
no production/test/workflow delta, no C++ build or broad suite was rerun. Groundwork
99+
validation passed at `31ccbeac65a37e85895163666281621fa726b51d` with three
100+
approvals (1 iteration, 0 fixed, 0 unworked); caller finalization records the
101+
diagnosis-only completion. Full CI-green acceptance remains incomplete.
100102

101103
## Evidence and boundaries
102104

0 commit comments

Comments
 (0)