feat(mothership): v1.0.0 #32756
Triggered via pull request
September 23, 2026 19:20
Status
Cancelled
Total duration
5m 40s
Artifacts
–
ci.yml
on: pull_request
Detect Version
Detect Desktop Changes
Prepare Trigger.dev
0s
Matrix: Build AMD64
Matrix: Build Dev ECR
Matrix: Build ARM64 (GHCR Only)
Matrix: Test and Build / oauth-postgres
Matrix: Test and Build / test-shard
Test and Build
/
Lint and Test
4m 5s
Test and Build
/
Build App
38s
Check Docs Changes
Migrate Dev DB
/
Apply Database Migrations
Matrix: Create GHCR Manifests
Process Docs
/
Process Documentation Embeddings
Promote Trigger.dev
0s
Prune Desktop Prereleases
Matrix: Attest Images
Desktop Release
/
Build, Sign, Notarize
Annotations
9 errors
|
Test and Build / Lint and Test
Canceling since a higher priority waiting request for ci-refs/pull/8208/merge exists
|
|
Test and Build / Lint and Test
The operation was canceled.
|
|
Test and Build / Lint and Test
Process completed with exit code 1.
|
|
Test and Build / PostgreSQL integration (migrate)
Canceling since a higher priority waiting request for ci-refs/pull/8208/merge exists
|
|
Test and Build / PostgreSQL integration (migrate)
The operation was canceled.
|
|
Test and Build / PostgreSQL integration (push)
Canceling since a higher priority waiting request for ci-refs/pull/8208/merge exists
|
|
Test and Build / PostgreSQL integration (push)
The operation was canceled.
|
|
CI
Canceling since a higher priority waiting request for ci-refs/pull/8208/merge exists
|
|
CI
Canceling since a higher priority waiting request for ci-refs/pull/8208/merge exists
|