docs(library): update best-gumloop-alternatives-in-2026 #32821
Triggered via pull request
September 24, 2026 03:55
Status
Failure
Total duration
5m 46s
Artifacts
–
ci.yml
on: pull_request
Detect Version
0s
Detect Desktop Changes
0s
Prepare Trigger.dev
0s
Matrix: Build AMD64
Matrix: Build Dev ECR
Matrix: Build ARM64 (GHCR Only)
Matrix: Test and Build / oauth-postgres
Matrix: Test and Build / test-shard
Test and Build
/
Lint and Test
3m 14s
Test and Build
/
Build App
3m 32s
Check Docs Changes
0s
Migrate Dev DB
/
Apply Database Migrations
Matrix: Create GHCR Manifests
Process Docs
/
Process Documentation Embeddings
Promote Trigger.dev
0s
Prune Desktop Prereleases
0s
Matrix: Attest Images
Desktop Release
/
Build, Sign, Notarize
Annotations
3 errors and 3 warnings
|
Test and Build / Lint and Test
Process completed with exit code 1.
|
|
Test and Build / PostgreSQL integration (migrate)
Process completed with exit code 1.
|
|
lib/knowledge/__integration__/member-document-lifecycle.integration.ts > member document lifecycle in PostgreSQL > finishes a pass within its page budget while listings re-stamp every observed document:
apps/sim/lib/knowledge/__integration__/member-document-lifecycle.integration.ts#L347
Error: Test timed out in 30000ms.
If this is a long-running test, pass a timeout value as the last argument or configure it globally with "testTimeout".
❯ lib/knowledge/__integration__/member-document-lifecycle.integration.ts:347:3
|
|
Test and Build / PostgreSQL integration (migrate)
Skipping sticky disk commit due to previous step failures
|
|
Test and Build / PostgreSQL integration (migrate)
- Step: unknown (failed)
|
|
Test and Build / PostgreSQL integration (migrate)
Found 2 failed/cancelled steps in previous workflow steps
|