You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Upgrade the toolchain to protocol 30 before testnet does #315
The newest Stellar Quickstart image runs stellar-core and stellar-rpc v30, and its local network upgrades itself to protocol 30. There, the current toolchain cannot deploy any contract: every deploy simulation fails with HostError: Error(Context, InternalError) (#313). CI now pins the previous image (#311 on feedback, #314 on main). Testnet already runs core and RPC v30 at protocol 29; once validators vote protocol 30, testnet deploys may fail the same way.
As a maintainer, I want the toolchain to support protocol 30 before testnet moves, so deploys and CI keep working.
Expected outcome
The contracts build and deploy on a protocol 30 network, CI runs against one, and the image pin is gone.
Acceptance criteria
soroban-sdk, the OpenZeppelin stellar-* crates, stellar-cli, stellar-scaffold-cli and @stellar/stellar-sdk are on versions that support protocol 30
On a local protocol 30 network the contracts deploy, the clients generate and the harness suites pass
The workspace tests and the Wasm upgrade tests pass
CI no longer pins the quickstart image
A testnet deploy works after testnet moves to protocol 30
Alternatives considered
Keep the pin until testnet moves. CI would keep testing protocol 29, but the first deploy after the vote could fail with no warning.
Technical notes
Current pins: soroban-sdk =26.1.1, OpenZeppelin stellar-* =0.7.2, Rust 1.97.0, stellar-cli 27.0.0, stellar-scaffold-cli 0.0.27, @stellar/stellar-sdk 16.1.0. The cause of the InternalError on protocol 30 is not known yet; finding it comes first.
Activity