Repository navigation
docs(loop): cycle 5 consolidated — T07d, B-28, B-21, T12a - #440
Merged
Merged
Conversation
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
B-21's changelog line said the harness cancels leftover work; the merged fix waits and never cancels (the cancelling version broke CI). T12a (#441) in CHANGELOG and loop-queue; retro S-14 (never cancel background work on a shared connection; a local pass of a timing-sensitive change is not evidence). Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
S-11 consolidation.
CHANGELOG.md[Unreleased]: fix(sync-history): the panel reads the row the API returns (B-28) #437 (B-28), feat(sync): each connection of a multi-connection project gets its own nightly job (T07d) #438 (T07d), test(integration): background work a test starts is cancelled before the next (B-21) #439 (B-21).loop-queue.md: T07d done; B-28 and B-21 rows; cycle-5 log (operator questions 0).backlog.md: B-21 done — and its "invalid# noqa" remainder corrected (chore(tests): test timeout for a loaded machine; ratchet prose ruff stops parsing (B-21) #418 had fixed it); B-28 added.Merged after #439, which this records as done.
Checks:
tests/unit/docs133 passed.🤖 Generated with Claude Code