Documented example outputs match the code; lower-level examples model loan proceeds - #59

Merged
dylanjm merged 3 commits into
mainfrom
pr3-documented-outputs
Oct 27, 2026
Merged

dylanjm merged 3 commits into
mainfrom
pr3-documented-outputs

Conversation

@j-bryan

@j-bryan j-bryan commented Oct 27, 2026

Copy link
Copy Markdown
Collaborator

Refs #56 (part 1: the numbers, the missing loan proceeds, and the regression test. A follow-up docs PR closes it.)

What changed

  • tests/test_documented_outputs.py
    • Runs the five README examples and the docs/getting_started.md code block as subprocesses.
    • Parses the documented values from the docs themselves (the README NPV table and the expected-output block) and compares them with the printed output.
    • Tolerances are $1M for the README's approximate values, and $1 and $0.005/MWh for getting_started.md.
    • Fails if a documented row is missing, a doc block is missing, a script prints no NPV, or a script exits nonzero.
    • Runtime is about 0.6s for all six cases, so it has no slow marker.
    • It failed first on the old docs (all 6 cases) before the values were regenerated.
  • _midlevel, _builders, _primitives: the examples now book construction debt proceeds as DEBT_FRACTION of each dated cash construction draw, as the EnergyProject compiler does.
  • _midlevel and _builders: these now amortize the proceeds plus capitalized interest, as EnergyProject does. Before, they amortized OVERNIGHT_CAPEX * DEBT_FRACTION.
    • Run with identical inputs, the lower-level path matches EnergyProject to the dollar on construction, proceeds and debt service, for both the flat and bell profiles.
    • _primitives has neither escalation nor construction interest, so its principal stays $300M.
  • Docs: the README comparison table and the getting_started.md expected output are regenerated. Only the numbers changed.

Result changes

Library code is unchanged. Only the examples and the documented values move.

Output Documented before Printed before After
_simple NPV ~$307M $375.7M ~$376M (code unchanged)
_full NPV ~$37M $337.0M ~$337M (code unchanged)
_midlevel NPV ~$186M $155.7M $345.2M
_builders NPV ~$162M $107.5M $308.2M
_primitives NPV ~−$36M $7.6M $257.8M
getting_started NPV $318,988,351 $387,452,247 $387,452,247
getting_started LCOE $23.30/MWh $18.64/MWh $18.64/MWh

Other printed values:

Example Debt service Taxes LCOE ($/MWh) Debt proceeds (new)
_midlevel −$704.8M → −$982.6M −$911.0M → −$877.5M $78.21 → $84.82 $337.4M
_builders −$581.4M → −$789.2M −$936.9M → −$915.8M $73.92 → $78.83 $341.1M
_primitives unchanged unchanged unchanged $300.0M

Deferred to the follow-up docs PR (#56 part 2)

  • Rewrite the explanations in examples/README.md "Output comparison" to match the code's assumptions. For example, _midlevel at $345M against _full at $337M should be explained by spend profile, depreciation and debt-service dating.
  • Document that the examples now share their financing treatment but still differ in spend profile, tax and incentives.
  • The examples pick out capitalized interest as the non-cash construction flows. That is correct for treatment="capitalize", which they use, but not for "pay".
  • _midlevel and _builders still date debt service at year-end, while EnergyProject calendarizes it.

🤖 Generated with Claude Code

j-bryan and others added 3 commits October 27, 2026 09:06
…rint

Refs #56

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…d principal

The midlevel, builders, and primitives examples now book debt proceeds as a share of each
dated cash construction draw. The midlevel and builders examples amortize the proceeds plus
capitalized interest, as the EnergyProject compiler does, instead of overnight cost times
the debt fraction.

Refs #56

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Refs #56

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

@dylanjm dylanjm left a comment

Copy link
Copy Markdown
Collaborator

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I like the automated testing of examples.

@dylanjm
dylanjm merged commit 717651c into main Oct 27, 2026
1 check passed
@dylanjm
dylanjm deleted the pr3-documented-outputs branch October 27, 2026 20:07
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants