Part of #511 (host side of James3014/Nexus-new#1384). This PR fixes only gap 1, the generation budget, so #511 stays open for gap 2.

Base: nexus/connector-host-v1@528dc50a · Head: 4360d0b3

What changes

  • New MAX_COMPLETION_INTEGRATION_GENERATIONS = 5 in src/github-completion-host.ts. It mirrors Nexus-new MAX_INTEGRATION_GENERATIONS / DEFAULT_MAX_INTEGRATION_GENERATIONS (main 7e1e3452).
  • That one constant drives:
    • the parseGitHubCompletionToolInput default and max (was 3)
    • both port generation guards in materialize_integration_head and read_required_checks, through the new exported parseCompletionGeneration (was positiveInt(..., 3))
    • the github_complete_pull_request schema maxGenerations .max() and its "at most N" description in src/nexus-gateway-proxy.ts
  • scripts/github_completion_bridge.py: the fallback max_generations changes from 3 to 5. The host always sends this value; the fallback is only a backstop.
  • revalidate_affected_dimension does not change. Every dimension, TEST_IMPACT included, still fails closed with requires_fresh_candidate_acceptance: true.

RED, then GREEN

  • RED on 528dc50: github-completion-host.test.ts failed on the missing export, and the proxy schema test failed with actual: 3, expected: 5.
  • GREEN: npm run typecheck is clean and npm test passes (exit 0).

Why TEST_IMPACT revalidation is not in this PR (design questions)

Doing it safely is not a bounded host change. The Nexus-new contract needs answers first:

  1. Order. The loop calls port.revalidate_affected_dimension(...) before materialize_integration_head, so the exact integration head I_n does not exist yet. The host could test a locally computed merge-tree(last_produced_head, new_main) tree. But the receipt binds only old/new_main_sha and source_candidate_*, and the loop never checks a revalidation tree against mat_result.integration_tree_sha. Passing would therefore not be mechanically bound to the head that gets checked and merged. Options: move the hook after materialization, or add integration_tree_sha to DimensionRevalidationReceipt and have the loop compare them.
  2. Selection. requalify_main_movement returns TEST_IMPACT with only a fixed reason string. It does not expose the build_impact_plan(...).pytest_targets it computed, and the bridge passes no target list. If the host computed its own selection, a second selection authority would appear. The selection should come from Nexus-new, either in the dimension result or in the hook parameters.
  3. Environment. TEST_IMPACT fires on pyproject.toml / uv.lock changes. The host runs pytest with a fixed NEXUS_PYTHON_BIN venv, which would be stale for exactly those movements. Who builds or attests the environment for the new lockfile? Or should dependency changes stay fail-closed?
  4. Overlap with CI. Exact-head required checks already run on I_n before CAS merge. Should the TEST_IMPACT receipt be a host-side pytest run, or a typed delegation to "the required checks for the selected targets on I_n"? The second would need no host test runner, but it does change the loop contract.

Note for review (not changed here)

The port guard caps the absolute generation (current_generation + 1). The loop, however, budgets relative to start_generation. When a PR is already at I3 and a later loop run starts, it gets only two more generations before the host rejects I6, even though the loop would allow five. That is the same behaviour as before, with a higher ceiling. Making it relative would need the host to learn start_generation.

No merge, deploy, rebuild or runtime activation is part of this PR.

🤖 Generated with Claude Code

James3014 and others added 3 commits October 13, 2026 19:36
…m (5)

RED on nexus/connector-host-v1@528dc50: missing export and the advertised
maxGenerations maximum is 3, not 5.

Refs James3014/Nexus-new#1384

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
One host constant MAX_COMPLETION_INTEGRATION_GENERATIONS=5 mirrors
Nexus-new MAX_INTEGRATION_GENERATIONS and drives the parser default and
max, both port generation guards, the proxy schema .max() and its
description, and the bridge fallback. revalidate_affected_dimension is
unchanged and still fails closed for every dimension.

Refs James3014/Nexus-new#1384

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Refs James3014/Nexus-new#1384

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
@James3014
James3014 merged commit cf62a6b into nexus/connector-host-v1 Oct 13, 2026
0 of 5 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant