Skip to content

docs(migration): reconcile the plan with the E0 issues and merged work - #15252

Merged
fpliger merged 1 commit into
v2from
coord-plan-reconcile
Oct 19, 2026
Merged

fpliger merged 1 commit into
v2from
coord-plan-reconcile

Conversation

@fpliger

@fpliger fpliger commented Oct 19, 2026

Copy link
Copy Markdown

Coordinator reconciliation micro-PR. Fixes plan self-consistency findings; no status cell, unit, gate or decision changes (status cells are in #15251, which touches other lines).

Finding Plan said Reality Fix
§B14 "Units that need a new issue" 75, including all of E0 E0 has #15172–#15177 E0 row removed; heading 70 (69 rows marked new plus U-E1-05 beyond #15108)
§B14 issue table no E0 issues, no strategy issues #15171–#15177, #15229, #15230, #15244, #15059 exist rows added; #15059 mapping marked proposed, to confirm with the user
migration-context.md status "No Part B unit is marked done yet. Last updated 2026-10-16" the host (U-E0-01) merged in #15232 updated; points to Part B for unit status
v2-host-strategy.md §4 "#14999, still open" merged, superseded by #15238 (agents through the host) past tense
v2-host-strategy.md §6 rule 2 distinct core-internal imports: 4 9 at 4c51aab (placement.ts --imports): agents plugin adds permission, shell, tool-output, util/wildcard; config discovery adds location updated, with the live source named

Not in this PR: the #13750 body still points at kilo-v2 (user update); the [v2-port] issue batch is not mapped (needs a decision); the rung labels of the #15018 config lines (open question to the user).

Checks: bun script/upstream/progress.ts --check up to date. No Changeset.

@github-actions

Copy link
Copy Markdown
Contributor

➖ v2 migration progress: 0.9% → 0.9% (0 done, 0 total, 0 dropped; 86/9829 cells)

Placement: 0 new marked lines in shared files, 0 new kilo_port annotations, 0 new core-internal imports.

Ratchets: 9 core-internal imports (base 9); shared patches by rung 29 seam, 1 patch (base 29 seam, 1 patch).

No change to the progress map.

v2 migration progress map at this commit

Full map · how cells close

@kilo-code-bot

kilo-code-bot Bot commented Oct 19, 2026 •

Copy link
Copy Markdown
Contributor

Code Review Summary

Status: No Issues Found | Recommendation: Merge

Files Reviewed (3 files)
  • migration-tracking/plans/kilo-v2-migration-plan.md
  • migration-tracking/plans/migration-context.md
  • migration-tracking/plans/v2-host-strategy.md

The E0 issue mapping matches Part B, the remaining-unit count is 70, and the referenced merges (#15231, #15232, #15238, #15246, #15248) and the 9 core-internal import ratchet are consistent with origin/v2 at 4c51aab. The U-E0-01 status cell still reads review: #15232; status cells are intentionally deferred to #15251.


Reviewed by deepseek-v4.1-flash-1017 · Input: 67.1K · Output: 9.9K · Cached: 983.8K

Review guidance: REVIEW.md from base branch v2

@fpliger
fpliger merged commit b557174 into v2 Oct 19, 2026
23 checks passed
@fpliger
fpliger deleted the coord-plan-reconcile branch October 19, 2026 21:58
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant