Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
6 changes: 3 additions & 3 deletions example_output/6.0/flow_path_augmentation_options_NNSW-SQ.csv
Original file line number Diff line number Diff line change
@@ -1,6 +1,6 @@
Flow path,Development path,Development Driver,Option Name,Augmentation Description,Forward direction power flow,"Notional transfer level increase (MW) Note: Same increase applies to all transfer limit conditions (Peak demand, Summer typical and Winter reference)_Forward direction","Notional transfer level increase (MW) Note: Same increase applies to all transfer limit conditions (Peak demand, Summer typical and Winter reference)_Reverse direction","Indicative cost estimate ($2023, $ million) - Note 2",Cost estimate source,Cost estimate class,Easement length in km,Lead time or Earliest in Service Date & 4,Additional REZ hosting capacity provided
NNSW-SQ,Near Queensland-New South Wales Interconnector (QNI) path,"Increase thermal capacity and, voltage and transient stability limits of 330 kV and 275 kV lines between Armidale and Braemar.",NNSW–SQ Option 1,"Option 1: • A new 330 kV single-circuit line from locality of New England Hub 5 to Dumaresq to Bulli Creek to Braemar. • A new 330/275 kV transformer at Braemar. • 330 kV Line shunt reactor at New England Hub 5, Dumaresq, Bulli Creek, and Braemar for the New England Hub 5 – Dumaresq - Bulli Creek - Braemar 330 kV circuits. (Pre-requisite: Cut-in both Tamworth-Armidale 330 kV lines to a new substation in locality of New England Hub 5).",NNSW to SQ,730,900,930964 (QLD works),Powerlink & Transgrid preparatory activity,Class 5,460.5,Medium,
NNSW-SQ,Near Queensland-New South Wales Interconnector (QNI) path,"Increase thermal capacity and, voltage and transient stability limits of 330 kV and 275 kV lines between Armidale and Braemar.",NNSW–SQ Option 2,"• A new 330 kV double-circuit line from locality of New England Hub 5 to Dumaresq to Bulli Creek to Braemar. • A new 330/275 kV transformer at Braemar. • 330 kV Line shunt reactors at New England Hub 5, Dumaresq, Bulli Creek, and Braemar, for the 330 kV lines between New England Hub 5 and Braemar (via Dumaresq and Bulli Creek). (Pre-requisite: Cut-in both Tamworth-Armidale 330 kV lines to a new substation in locality of New England Hub 5).","• A new 330 kV double-circuit line from locality of New England Hub 5 to Dumaresq to Bulli Creek to Braemar. • A new 330/275 kV transformer at Braemar. • 330 kV Line shunt reactors at New England Hub 5, Dumaresq, Bulli Creek, and Braemar, for the 330 kV lines between New England Hub 5 and Braemar (via Dumaresq and Bulli Creek). (Pre-requisite: Cut-in both Tamworth-Armidale 330 kV lines to a new substation in locality of New England Hub 5).",1260,1700,12101309 (QLD works),Powerlink & Transgrid preparatory activity,Class 5,460.5,Medium,
NNSW-SQ,Near Queensland-New South Wales Interconnector (QNI) path,"Increase thermal capacity and, voltage and transient stability limits of 330 kV and 275 kV lines between Armidale and Braemar.",NNSW–SQ Option 1,"Option 1: • A new 330 kV single-circuit line from locality of New England Hub 5 to Dumaresq to Bulli Creek to Braemar. • A new 330/275 kV transformer at Braemar. • 330 kV Line shunt reactor at New England Hub 5, Dumaresq, Bulli Creek, and Braemar for the New England Hub 5 – Dumaresq - Bulli Creek - Braemar 330 kV circuits. (Pre-requisite: Cut-in both Tamworth-Armidale 330 kV lines to a new substation in locality of New England Hub 5).",NNSW to SQ,730,900,930 (NSW works) 964 (QLD works),Powerlink & Transgrid preparatory activity,Class 5,460.5,Medium,
NNSW-SQ,Near Queensland-New South Wales Interconnector (QNI) path,"Increase thermal capacity and, voltage and transient stability limits of 330 kV and 275 kV lines between Armidale and Braemar.",NNSW–SQ Option 2,"• A new 330 kV double-circuit line from locality of New England Hub 5 to Dumaresq to Bulli Creek to Braemar. • A new 330/275 kV transformer at Braemar. • 330 kV Line shunt reactors at New England Hub 5, Dumaresq, Bulli Creek, and Braemar, for the 330 kV lines between New England Hub 5 and Braemar (via Dumaresq and Bulli Creek). (Pre-requisite: Cut-in both Tamworth-Armidale 330 kV lines to a new substation in locality of New England Hub 5).","• A new 330 kV double-circuit line from locality of New England Hub 5 to Dumaresq to Bulli Creek to Braemar. • A new 330/275 kV transformer at Braemar. • 330 kV Line shunt reactors at New England Hub 5, Dumaresq, Bulli Creek, and Braemar, for the 330 kV lines between New England Hub 5 and Braemar (via Dumaresq and Bulli Creek). (Pre-requisite: Cut-in both Tamworth-Armidale 330 kV lines to a new substation in locality of New England Hub 5).",1260,1700,1210 (NSW works) 1309 (QLD works),Powerlink & Transgrid preparatory activity,Class 5,460.5,Medium,
NNSW-SQ,Near Queensland-New South Wales Interconnector (QNI) path,"Increase thermal capacity and, voltage and transient stability limits of 330 kV and 275 kV lines between Armidale and Braemar.",NNSW–SQ Option 3,• A Virtual Transmission Line option with a 200 MW energy storage system south of Armidale and north of Braemar.,• A Virtual Transmission Line option with a 200 MW energy storage system south of Armidale and north of Braemar.,200,200,Non-network option costs to be provided by interested parties,Non-network option costs to be provided by interested parties,Non-network option costs to be provided by interested parties,Non-network option costs to be provided by interested parties,Non-network option costs to be provided by interested parties,
NNSW-SQ,West of Queensland-New South Wales Interconnector (QNI) path,West of Queensland-New South Wales Interconnector (QNI) path,NNSW–SQ Option 4,• A 2000 MW HVDC bi-pole overhead transmission between a new substation in North West New South Wales (NWNSW) REZ and Halys. • A new 2000 HVDC bipole converter station in North West New South Wales • A new 2000 HVDC bipole converter station in locality of Halys. • AC network connection between HVDC converter station and 275 kV substation in Halys. • AC network connection between HVDC converter station and ac network in in NWNSW REZ. • A new 330 kV line between NWNSW REZ and Tamworth.,• A 2000 MW HVDC bi-pole overhead transmission between a new substation in North West New South Wales (NWNSW) REZ and Halys. • A new 2000 HVDC bipole converter station in North West New South Wales • A new 2000 HVDC bipole converter station in locality of Halys. • AC network connection between HVDC converter station and 275 kV substation in Halys. • AC network connection between HVDC converter station and ac network in in NWNSW REZ. • A new 330 kV line between NWNSW REZ and Tamworth.,1800,2000,4279,AEMO (TCD),Class 5b,765,Long,
NNSW-SQ,West of Queensland-New South Wales Interconnector (QNI) path,West of Queensland-New South Wales Interconnector (QNI) path,NNSW–SQ Option 5,"• Establish a new substation in NNSW and to New England REZ Hub 5. • A new 500/275 kV transformer at Halys substation • A new 1x500 kV double-circuit line between Halys and new Dumaresq 500kV substation in NNSW. • A new 1x500 kV double-circuit line between Dumaresq and New England REZ Hub 5). • 2x 500/330 kV transformers connecting to 330kV Dumaresq Pre-requisite: CQ-SQ Option 5 (QEJP), CNSW-NNSW Option 1.","• Establish a new substation in NNSW and to New England REZ Hub 5. • A new 500/275 kV transformer at Halys substation • A new 1x500 kV double-circuit line between Halys and new Dumaresq 500kV substation in NNSW. • A new 1x500 kV double-circuit line between Dumaresq and New England REZ Hub 5). • 2x 500/330 kV transformers connecting to 330kV Dumaresq Pre-requisite: CQ-SQ Option 5 (QEJP), CNSW-NNSW Option 1.",3000,2250,26002659 (QLD works),Powerlink & Transgrid preparatory activity,Class 5,616,Long,SWQLD1 : 700
NNSW-SQ,West of Queensland-New South Wales Interconnector (QNI) path,West of Queensland-New South Wales Interconnector (QNI) path,NNSW–SQ Option 5,"• Establish a new substation in NNSW and to New England REZ Hub 5. • A new 500/275 kV transformer at Halys substation • A new 1x500 kV double-circuit line between Halys and new Dumaresq 500kV substation in NNSW. • A new 1x500 kV double-circuit line between Dumaresq and New England REZ Hub 5). • 2x 500/330 kV transformers connecting to 330kV Dumaresq Pre-requisite: CQ-SQ Option 5 (QEJP), CNSW-NNSW Option 1.","• Establish a new substation in NNSW and to New England REZ Hub 5. • A new 500/275 kV transformer at Halys substation • A new 1x500 kV double-circuit line between Halys and new Dumaresq 500kV substation in NNSW. • A new 1x500 kV double-circuit line between Dumaresq and New England REZ Hub 5). • 2x 500/330 kV transformers connecting to 330kV Dumaresq Pre-requisite: CQ-SQ Option 5 (QEJP), CNSW-NNSW Option 1.",3000,2250,2600 (NSW works) 2659 (QLD works),Powerlink & Transgrid preparatory activity,Class 5,616,Long,SWQLD1 : 700
Original file line number Diff line number Diff line change
@@ -1,3 +1,3 @@
Flow path,Development path,Development Driver,Option Name,Augmentation Description,Forward direction power flow,"Notional transfer level increase (MW) Note: Same increase applies to all transfer limit conditions (Peak demand, Summer typical and Winter reference)_Forward direction","Notional transfer level increase (MW) Note: Same increase applies to all transfer limit conditions (Peak demand, Summer typical and Winter reference)_Reverse direction","Indicative cost estimate ($2023, $ million) - Note 2",Cost estimate source,Cost estimate class,Easement length in km,Lead time or Earliest in Service Date & 4,Additional REZ hosting capacity provided
TAS-VIC,Proposed Marinus Link path (path between Burnie area and Latrobe Valley area),Access to high quality wind resources in Tasmania and deep storage capability of Tasmanian hydro generation.,TAS-VIC Option 1 (Project Marinus Stage 1),"•A 750 MW monopole HVDC link between Burnie area in Tasmania and Hazelwood area in Victoria. • A new 750 MW HVDC monopole converter station in Burnie area. • A new 750 MW HVDC monopole converter station in Hazelwood area. • A new 220 kV switching station at Heybridge adjacent to the converter station. • A new double-circuit 220 kV transmission line between Sheffield, Heybridge and Burnie • A new 220 kV double-circuit line from Palmerston to Sheffield with decommissioning of existing the single-circuit line. • A new 500 kV connection from converter station in Hazelwood area. • Decommission existing Sheffield – Burnie 220 kV line. Note: HVDC interconnector components are referred to as Marinus Link 1",TAS to VIC,750 Basslink and Marinus Link 1 combined transfer limit 1344,750 Basslink and Marinus Link 1 combined transfer limit 978,3840,TasNetworks Marinuslink,Class 4,~90 (underground cable) 0 (HVAC new easement),Dec-30 (See note 7),Dec-30 (See note 7)
TAS-VIC,Proposed Marinus Link path (path between Burnie area and Latrobe Valley area),Access to high quality wind resources in Tasmania and deep storage capability of Tasmanian hydro generation.,TAS-VIC Option 2 (Project Marinus Stage 2),• An additional 750 MW monopole HVDC link between Burnie area in Tasmania and Hazelwood area in Victoria. • An additional new 750 MW HVDC monopole converter station in Burnie area. • An additional new 750 MW HVDC monopole converter station in Hazelwood area. • A new 220 kV switching station at Staverton. • A new double-circuit 220 kV transmission line from Staverton to Burnie via Hampshire • Cut-in both Sheffield-Mersey Forth double-circuit 220 kV lines at Staverton. • Capacity increase of the four Sheffield–Staverton 220 kV transmission circuits. • A new 500 kV connection from converter station in Hazelwood area. Pre-requisite: TAS-VIC Option 1 (Project Marinus Stage 1) Note: HVDC interconnector components are referred to as Marinus Link 2,• An additional 750 MW monopole HVDC link between Burnie area in Tasmania and Hazelwood area in Victoria. • An additional new 750 MW HVDC monopole converter station in Burnie area. • An additional new 750 MW HVDC monopole converter station in Hazelwood area. • A new 220 kV switching station at Staverton. • A new double-circuit 220 kV transmission line from Staverton to Burnie via Hampshire • Cut-in both Sheffield-Mersey Forth double-circuit 220 kV lines at Staverton. • Capacity increase of the four Sheffield–Staverton 220 kV transmission circuits. • A new 500 kV connection from converter station in Hazelwood area. Pre-requisite: TAS-VIC Option 1 (Project Marinus Stage 1) Note: HVDC interconnector components are referred to as Marinus Link 2,750 Basslink and Marinus Link1&2 combined transfer limit 2094,750 Basslink and Marinus Link1&2 combined transfer limit 1728,2735 Note: This part is estimated to cost an additional $235 million if completed more than 2 years after Stage 1,TasNetworks Marinuslink,Class 4,0~94 (HVAC new easement),Dec-32 (See note 7),Dec-32 (See note 7)
TAS-VIC,Proposed Marinus Link path (path between Burnie area and Latrobe Valley area),Access to high quality wind resources in Tasmania and deep storage capability of Tasmanian hydro generation.,TAS-VIC Option 2 (Project Marinus Stage 2),• An additional 750 MW monopole HVDC link between Burnie area in Tasmania and Hazelwood area in Victoria. • An additional new 750 MW HVDC monopole converter station in Burnie area. • An additional new 750 MW HVDC monopole converter station in Hazelwood area. • A new 220 kV switching station at Staverton. • A new double-circuit 220 kV transmission line from Staverton to Burnie via Hampshire • Cut-in both Sheffield-Mersey Forth double-circuit 220 kV lines at Staverton. • Capacity increase of the four Sheffield–Staverton 220 kV transmission circuits. • A new 500 kV connection from converter station in Hazelwood area. Pre-requisite: TAS-VIC Option 1 (Project Marinus Stage 1) Note: HVDC interconnector components are referred to as Marinus Link 2,• An additional 750 MW monopole HVDC link between Burnie area in Tasmania and Hazelwood area in Victoria. • An additional new 750 MW HVDC monopole converter station in Burnie area. • An additional new 750 MW HVDC monopole converter station in Hazelwood area. • A new 220 kV switching station at Staverton. • A new double-circuit 220 kV transmission line from Staverton to Burnie via Hampshire • Cut-in both Sheffield-Mersey Forth double-circuit 220 kV lines at Staverton. • Capacity increase of the four Sheffield–Staverton 220 kV transmission circuits. • A new 500 kV connection from converter station in Hazelwood area. Pre-requisite: TAS-VIC Option 1 (Project Marinus Stage 1) Note: HVDC interconnector components are referred to as Marinus Link 2,750 Basslink and Marinus Link1&2 combined transfer limit 2094,750 Basslink and Marinus Link1&2 combined transfer limit 1728,2735,TasNetworks Marinuslink,Class 4,0 (underground cable) ~94 (HVAC new easement),Dec-32 (See note 7),Dec-32 (See note 7)
2 changes: 1 addition & 1 deletion example_output/6.0/rez_augmentation_options_TAS.csv
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,7 @@ T1,North East Tasmania,,"• Second 220 kV double-circuit line between the new s
T2,North West Tasmania,Option 1,• Build a new 220 kV switching station at Staverton and cut-in all Sheffield-Mersey Forth 220 kV lines at Staverton. • Build a new double-circuit Staverton-Hampshire Hills 220 kV line. • Build new Hampshire Hills wind collector station.,800,304,AEMO TCD,Class 4,0.38,59,Short,Included as connection cost
T2,North West Tasmania,Option 2,"• Build new “Farrell 2” wind collector station on west coast Tasmania (nearby existing Farrell substation) and establish new double-circuit Farrell2-Hampshire Hills 220 kV line. Pre-requisite: TAS-VIC Option 2, T2 Option 1.",500,258,AEMO TCD,Class 5a,0.516,65,Long,
T2,North West Tasmania,Option 3,"• Build double-circuit West Montagu-Hampshire 220 kV line. • Build a second 220 kV double-circuit line from Hampshire Hills to Burnie to Heybridge. Pre-requisite: TAS-VIC Option 2, T2 Option 1.",800,534,AEMO TCD,Class 5a,0.6675,132,Medium,
T3,Central Highlands,Option 1,"• Build a Palmerston-Waddamana 220 kV double-circuit line. Prior to (without) MarinusLink: • If before Marinus Link 1, bring forward the rebuild of Palmerston-Sheffield 220 kV line as double-circuit and build 2 x power flow controllers on the 2 x 220 kV transmission lines from Palmerston-Sheffield. With MarinusLink: • If after Marinus Link 1, build 2 x power flow controllers on the 2 x 220 kV transmission lines from Palmerton-Sheffield.",690,201434 (without Marinus Link),AEMO TCD,Class 5a,0.6289855072463768,00 (without Marinus Link),Short,Included as connection cost
T3,Central Highlands,Option 1,"• Build a Palmerston-Waddamana 220 kV double-circuit line. Prior to (without) MarinusLink: • If before Marinus Link 1, bring forward the rebuild of Palmerston-Sheffield 220 kV line as double-circuit and build 2 x power flow controllers on the 2 x 220 kV transmission lines from Palmerston-Sheffield. With MarinusLink: • If after Marinus Link 1, build 2 x power flow controllers on the 2 x 220 kV transmission lines from Palmerton-Sheffield.",690,201 (with Marinus Link) 434 (without Marinus Link),AEMO TCD,Class 5a,0.6289855072463768,0 (with Marinus Link) 0 (without Marinus Link),Short,Included as connection cost
T3,Central Highlands,Option 2,"• Build a second Palmerston-Sheffield 220 kV double-circuit line. Pre-requisite: TAS-VIC Option 2, T3 Option 1.",675,274,AEMO TCD,Class 5a,0.4059259259259259,79,Long,
T4,North Tasmania Coast,Option 1,• Build a new Burnie-Heybridge-Sheffield 220 kV double-circuit line. Pre-requisites: TAS-VIC Option 2.,1360,206,AEMO TCD,Class 5a,0.1514705882352941,53,Long,Included as connection cost
T4,North Tasmania Coast,Option 2,• Build a new George Town-Sheffield 220 kV double-circuit line. • Build 2 x power flow controllers on the 2 x 220 kV double-circuit line between George Town-Hadspen. Pre-requisite: TAS-VIC Option 2.,900,307,AEMO TCD,Class 5a,0.3411111111111111,68,Long,Included as connection cost
2 changes: 1 addition & 1 deletion example_output/7.0/pumped_hydro_properties.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3,7 +3,7 @@ Snowy 2.0,2200,159.0,76.0
Lower Tumut,1500,,78.0
Wivenhoe,570,10.0,70.0
Shoalhaven,240,64.0,70.0
Kidston,250325 (pump),6.0,80.0
Kidston,250 (generation) 325 (pump),6.0,80.0
Cethana,750,20.0,76.0
Borumba,1998,24.0,76.0
New Entrant PHES,,,76.0
Loading
Loading