Skip to content

[scheduled-gate:test.yml] CI is failing on main #10030

Description

@github-actions

CI has a completed red post-merge run.

Current failure

  • Run: 37140685651
  • Head: 4e6e68ee0aa2529f4ee1f95e26ea0edad81b6a7f
  • Trigger: push

Failing rows

  • cargo-test / Run cargo test
  • compiler-output-regression / Gate native-ABI proof compiler output
  • compiler-output-regression / Gate native-region proof compiler output
  • lint / File size limit
  • lint / GC header constant consistency
  • lint / Object-header shape-descriptor census
  • lint / Raw-handle debt ratchet
  • lint / Runtime GC-pointer holder custody audit
  • lint / SSO string-unboxing inventory
  • lint / String payload-access inventory
  • lint / Thread-exit custody of address-keyed globals (#11471)
  • lint / Unrooted-local shape ratchet
  • main-gate / Require the plan and every planned job to have passed
  • warnings / rustc warnings (host-compatible, all targets)
  • windows-build / GC structural audits (Windows)

Delta from the previous failed run

Previous failure: c17090892e2a

New failing rows:

  • None.

Rows that recovered:

  • gc-call-effects (macos-aarch64, macos-14) / Build the archives and compare the committed table
  • gc-call-effects (windows-x86_64, ubuntu-latest) / Build the archives and compare the committed table
  • gc-call-effects-linux / Committed table vs. the archives

Last green main result

No green post-merge run was found in the last 100 results.

Maintained automatically by gate-failure-watch.yml for test.yml. Repeated failures update this issue; the next green run closes it.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions