Repository navigation
docs: Add the Impact page's weekly backlog chart to Reporting & ROI - #1136
promptless[bot] wants to merge 9 commits into
Conversation
|
The latest updates on your projects. Learn more about Vercel for GitHub.
|
…e-backlog-waterfall # Conflicts: # src/content/changelog/changelogs/october-2026.mdx
…e-backlog-waterfall # Conflicts: # src/content/docs/docs/for-docs/measure/reporting-and-roi.mdx
|
I noticed that some CI checks failed for this PR. I'm investigating whether the failures are caused by this suggestion. If they're unrelated or pre-existing, I'll leave this suggestion unchanged and create a separate suggestion if a standalone docs fix is needed. |
…e-backlog-waterfall
|
@Promptless Please retry CI repair for this PR. The current head, 19e7470, fails Vale Direct.Length in src/content/docs/docs/for-docs/measure/reporting-and-roi.mdx: the sentences at lines 120 and 126 have 33 and 27 words. Split them while preserving their meaning and the docs rewrite from #1177. Push the correction to this PR and verify its checks pass. Leave the PR open for review. The automatic repair webhook was skipped because the retry counter incorrectly counted CI events for other suggestions. This explicit request authorizes a fresh repair of this PR. |
|
In reply to this discussion Got it: I'm splitting the long sentences at lines 120 and 126 of reporting-and-roi.mdx and keeping the #1177 rewrite. I'll push the fix to this PR, confirm the checks pass, and reply here with the result. |
|
In reply to this discussion I pushed Docs PR: #1136 |
Proposed changes
Promptless/promptless#5491 turned Settings → Impact into a weekly backlog waterfall: each week steps up by suggestions created, down by suggestions merged and closed, and lands on the backlog still open, over 4, 8, or 12 weeks. The Reporting & ROI guide still said Promptless has no built-in reporting dashboard and never mentioned the Impact page.
reporting-and-roi.mdx: adds the Impact page as a place to read signal, and uses it for the doc-updates-shipped and review-throughput metrics and the report-building steps. Removes the claim that Promptless has no reporting dashboard.october-2026.mdx: new October 2026 changelog with an entry for the weekly backlog chart.Checklist
The chart is described from source (
settingsNav.ts,SuggestionFlowChart.tsx,flowChartChrome.tsx,runtime/dashboard/impact/flow.py). The source PR notes it was not viewed in a running app, and I did not check the rendered page in a running dashboard either.Merged current
main, including the #1177 docs rewrite. Two report-building steps were split to stay under the ValeDirect.Lengthlimit of 25 words, with the same sources and meaning. Localvalepasses onreporting-and-roi.mdxwith no alerts.