Repository navigation
docs(portfolio): revalidate workspace plan and preserve historical survey - #60
Draft
bryansayler wants to merge 2 commits into
Draft
bryansayler wants to merge 2 commits into
bryansayler wants to merge 2 commits into
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Outcome
The October 17 portfolio review deadline made unrelated validation fail. Reassess the existing plan on October 30, preserve the October 3 survey wording (only historical heading depth changes), and replace its current action queue with verified changes, dependencies, owner decisions, and explicit unknowns. Next review checkpoint: November 3.
The public correction contains evidence for seven public repositories, with five reusable-workflow calls across four policy SHAs. Nonpublic assessment is retained separately; no new private-derived counts or per-repository findings are published here. Registry classifications, owners, schemas, workflow pins, tests, and freshness enforcement remain unchanged.
Exact subject
d320f775a1be9ca8f6becfc19c84165bed176d1dbc4d582573306d076c3611f8463dce42d8be90ab7c52c0407ea2fa6d3fa99cf13d86492a74733259Scope and authority
IMPLEMENTATION_DETAIL; documentation projection only. No new concepts, classification, ownership, admission, runtime, release, deployment, or merge authority. Draft for owner review. Use a merge commit if approved to preserve receipt subjects.Evidence and verification
qreceipt.portfolio-review-20261030.bc4d58257330Quirk-Systems/.github7c52c0407ea2fa6d3fa99cf13d86492a74733259.quirk/evidence/portfolio-review-20261030-bc4d58257330.jsonsha256:a4c83014eb2167988c42603dc22c722f0a68157753d14af7a642e71b10968e02Baseline main:
scripts/validate.shran 233 tests, with 232 passing and the sole failure beingtest_repository_documents_are_fresh_todayfor this document. It stopped before subsequent stages.Tested subject:
scripts/validate.shexited 0 — all 233 tests and subsequent executed validators passed, including offline pedantic zizmor. Strict living-document validation passed: five documents, zero stale. Historical prose preservation and public-source evidence counts were checked; diff whitespace passed. Exact base/head receipt coverage passed: 85 receipts, using full 40-character base and head SHAs.Skipped: ruff and actionlint were unavailable. Preserved: 21 existing concept warnings and 20 existing zizmor ignores. No application-wide installs/tests were rerun; scanner command discovery is not execution proof.
Interoperability impact
No schemas, APIs, consumers, permissions, or workflows change. The evidence JSON is a dated observation artifact, not a replacement registry. Private review details are excluded from this public delta.
Risk, rollback, and residue
Repository/PR states can change after the recorded heads. Four other living documents retain October 31 deadlines and require their own substantive reviews before November 1; this patch does not advance them. Shared policy selection, inventory changes, Core manifest, OS validation entrypoint, and hosted access remain separate work.
Baseline Governance Contracts run 41004601321 failed with one job and zero steps. Earlier PR #47 records a billing lock, but current annotations were unavailable through this connection. Local freshness repair does not establish hosted execution success. At this PR head, Governance Contracts, Dependency Review, and CodeQL all failed before execution: each has one job, no assigned runner, and zero steps. The annotation-specific cause remains unavailable; no hosted check passed.
Revert this subject and its receipt together to undo the correction while preserving original historical evidence.
Linked issues and PRs
Refs #44, #47, #55, #51, #59. Reuses existing portfolio planning rather than replacing the governance framework.
Checklist