Add regional capital cost multipliers for geothermal techs - #255
Open
shashwatsharma24 wants to merge 2 commits into
Open
shashwatsharma24 wants to merge 2 commits into
shashwatsharma24 wants to merge 2 commits into
Conversation
This branch has not been deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
This PR addresses issue#233 and adds geothermal regional capital cost multipliers to ReEDS.
Technical details
Currently
inputs/financials/reg_cap_cost_diff_default.csvdoes not include values for geothermal techs. This PR adds values forGEOtech group (covers all geothermal techs) using data from Table 1-11 of EIA's capital costs report.Implementation notes
EIA reported values for geothermal locational adjustments are at the state-city level; these are processed using the workflow in
ReEDS_Input_Processing/capital_cost_multipliersrepo. 32 counties had missing values, so I assigned them values from the nearest county in the same state (nearly all of these were in the eastern interconnect and had difference values of zero).The list of missing counties and counties they were mapped to is available here: geo_missing_fips.csv
Values for WI states are plotted below.

Issues resolved
Issue#233
Validation, testing, and comparison report(s)
Total capacity stack remains nearly similar under both ATB Moderate and Advanced scenario cases; geothermal buildout decreases slightly (~2-3GW) by 2050 due to higher state-level capital costs, and PV/onshore wind buildout increases by 4-6GW. Discounted total system cost increases slightly by ~$3B (ATB Moderate) to ~$6.7B (ATB Advanced).
ATB Moderate:

ATB Advanced:

Looking at state-level differences in geothermal buildout, we can see that most of the ~2-3GW decrease is in installed capacity for California and Oregon.
ATB Moderate:

ATB Advanced:

Comparison reports:
ATB Moderate costs:
results-ATB-Mod,ATB-Mod_ccmult.pptx
ATB Advanced costs:
results-ATB-Adv,ATB-Adv_ccmult.pptx
Checklist for author
Details to double-check
d_objective.gms, they are included inobjective_function_params.yamlfor completeness checkinghourlize/resource.pywas rerun to regenerate the existing/prescribed VRE capacity dataGeneral information to guide review
Did you use LLM tools (chatbot or copilot) in the preparation of this PR? If so, describe how
Tag points of contact here if you would like additional review of the relevant parts of the model