Skip to content

feat(e2e,compliance): complete end-to-end verification, v0.4.0 packaging, and rolling update plan - #9

Merged
celttechie merged 2 commits into
mainfrom
feat/e2e-verification-v0.4.0
Nov 12, 2026
Merged

celttechie merged 2 commits into
mainfrom
feat/e2e-verification-v0.4.0

Conversation

@celttechie

@celttechie celttechie commented Nov 12, 2026 •

Copy link
Copy Markdown
Owner

Summary of Changes

  • Configured CGO_ENABLED=0 GOOS=linux static binary compilation in Makefile for Alpine/musl runtime compatibility.
  • Aligned zarf.yaml and manifests/operator/deployment.yaml to v0.4.0 and added multi-modal NIST IA-5 validation in compliance/oscal-component.yaml (4/4 controls satisfied).
  • Enhanced docs/end-to-end-verification-runbook.md and added docs/plan-golden-images-rolling-updates-persistence.md for v0.5.0.

Problem & Motivation

Incorporates fixes discovered during full end-to-end verification on kubevirt-dev-platform and establishes the architecture blueprint for Milestone v0.5.0.

NIST 800-53 Compliance Checklist

  • SC-7 (Boundary Protection): Zero-Trust NetworkPolicy isolation verified by Lula (sc-7: satisfied).
  • AC-3 / IA-5 (Access Control & Identification): Multi-modal Linux/Windows IA-5 and AC-3 rules verified by Lula (4/4 satisfied).
  • SI-7 (Software & Information Integrity): Negative Zarf tamper test and negative CDI PR #4340 checksum rejection test passed (0 bytes written).
  • SA-11 (Developer Security Testing): Automated Go (go test -race) test suite passes without regressions (15/15 tests).
  • CM-6 (Configuration Settings): CRD and declarative manifests pass validation schema.

Air-Gap & Edge Readiness

  • No unflattened QCOW2 external backing chains introduced.
  • All required artifacts/dependencies bundled in disconnected Zarf package (zarf-package-uds-vm-operator-amd64-0.4.0.tar.zst).
  • +6% CDI filesystem overhead calculation validated for storage sizing.

Testing & Verification

Automated Tests

go test -v -race ./...
make lula-validate

Live Cluster Verification

  • Tested on live K3s / KubeVirt cluster (kubevirt-sandbox): Negative Zarf & CDI SI-7 tests, Zarf deploy, uds-vmctl power, Lula 4/4 satisfied, and /metrics scrape
  • Verified status subresource transitions (WaitingForUpload -> Ready)

Documentation

  • README.md, ROADMAP.md, docs/end-to-end-verification-runbook.md, and docs/plan-golden-images-rolling-updates-persistence.md updated.
  • CRD manifests synchronized with Go types.

…ing, and rolling update plan

- Fix Alpine container execution with CGO_ENABLED=0 static compilation in Makefile
- Synchronize zarf.yaml and deployment manifests to v0.4.0
- Add multi-modal NIST IA-5 rule to oscal-component.yaml (4/4 satisfied in Lula)
- Document pre-merge CDI CRD preservation and port-forwarding in verification runbook
- Add comprehensive architecture plan for golden image DataSources, persistence, and rolling updates
- Link to Milestone v0.5.0 Architecture Proposal in README and ROADMAP
- Update README Zarf package deploy command to v0.4.0
- Document multi-modal NIST IA-5 compliance rule in compliance table
- Refine proposal document metadata (author: Brian Jarrett, target: v0.5.0) and adopt professional systems architecture terminology
@celttechie
celttechie merged commit 06ede44 into main Nov 12, 2026
3 checks passed
@celttechie
celttechie deleted the feat/e2e-verification-v0.4.0 branch November 12, 2026 16:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant