Skip to content

analog M5e: the SAR inverter delays into 20 fF from the PSP103 tables with charge, the last NOT MODELLED row of the inverter block #11350

Closed as not planned

Description

@gHashTag

Part of the analog epic (see #10486). After #11325 the external team's per-block checks give 7 PASS, 0 FAIL, 6 NOT MODELLED of 13 blocks. The inverter block is NOT MODELLED only for one row: its fall and rise delays into 20 fF (the report: 81 ps and 100 ps; the limit 1 to 500 ps); its switching threshold already passes (0.6892 V against 0.69 V).

The tt PSP103 tables with their drain and gate charge (M3c, mos_psp103.t27, mos_table.t27) already give the 500 fF inverter's 50 % delays within 0.02 % of ngspice backward Euler on a 100 ps grid. 20 fF needs a much finer step and the SAR inverter's own device sizes from the converter netlist (W, L and m as the existing comparator decks state them).

Only .t27 (skill only-t27); decks under specs/analog/decks/.

Requirements

  • FR-001: The inverter of the SAR netlist (its W, L and m; bulks as the netlist has them) into 20 fF MUST be stepped on the tt tables with the devices' charge (and the Vsb axis of analog M3e: a source-to-bulk axis on the PSP103 log tables, so the tgate Ron with its bulks on the rails is within 0.09 percent of ngspice #11288 where a source is not at its bulk), on a step fine enough that halving it moves each delay by less than 1 %.
  • FR-002: The fall and rise 50 % delays MUST be compared with our own ngspice-47 run of the same cell into 20 fF (container jobs on the reference host, at most 6 of its 12 cores, removed afterwards), the gap printed in percent; the row is PASS only inside the report's limit AND within 10 % of ngspice.
  • FR-003: accept_sar.t27 and docs/analog/accept-sar-2026-10-20.md recompute the inverter block and the totals.
  • FR-004: a negative control: the charge removed, the delay is refused by the 10 % bar.

Boundary

  • specs/analog/ (a new spec for the 20 fF run if needed; mos_table.t27, mos_psp103.t27 only by extension)
  • specs/analog/accept_sar.t27
  • specs/analog/decks/
  • docs/analog/

Success Criteria

  • t27c test-report on every changed spec prints FAIL 0 and vacuous passes 0
  • the inverter delay rows are PASS, or the measured gap is written and the rows stay NOT MODELLED with the reason

🤖 Generated with Claude Code

Activity

  1. added
    shape-refusedClosed by the issue-shape gate (specs/policy/issue_shape.t27); a passing edit reopens it
    on Oct 20, 2026
  2. github-actions commented on Oct 20, 2026

    @github-actions
    Contributor

    Closed by the issue-shape gate (specs/policy/issue_shape.t27, #7498): an issue must have the template's sections. Edit the body; an edit that passes reopens it.

    • missing: ## User Scenarios -- at least one Given/When/Then scenario
    • missing: ## Success Criteria -- an outcome a machine can settle: a number with a unit, a backticked file, exit 0, or a backticked command
  3. added 2 commits that reference this issue on Oct 20, 2026
    e424dfd
    57f1a55
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    shape-refusedClosed by the issue-shape gate (specs/policy/issue_shape.t27); a passing edit reopens it

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests