A configurable merchandising and retail calendar for Python: NRF 4-5-4, 4-4-5, 5-4-4 and custom leap year calendars, with their Gregorian boundaries.
This is a port of the retail-calendar npm package (v4.1.2). It
produces the same calendars, and its integer and label values match the JS package, so a calendar configuration can be
shared between the two as it is.
- No dependencies outside the Python standard library.
- Typed (
py.typed), immutable value objects, cached calendars. - Python 3.11+.
Important
Note for AI agents and contributors: keep this repo and holonk/retail-calendar in sync.
The two packages are one calendar in two languages. Systems that use both must agree on which week a date belongs to, so the packages must never disagree. When you add a feature, fix a bug or change behavior in either repo:
- Make the same change in the other repo, in the same piece of work. Never fix a bug on one side only, even an
obvious one such as the December-only
LAST_DAY_BEFORE_EOM_EXCEPT_LEAP_YEARlook-ahead. - Keep the public contract identical: enum integer values and labels, option names (camelCase in JS,
from_dict/to_dictkeys here), defaults and validation rules. - Add the same test cases to both test suites. Fixtures converted from the JS tests live in
tests/data. - Release the JS package, pin the new version in
scripts/golden/package.json, regenerate the reference data (see Parity with the JS package) and commit it with the Python change.tests/test_golden.pymust pass against the regenerated data. - Update both READMEs, including the JS to Python table below.
- Release both packages (see Releasing).
Python-only conveniences that don't change calendar results don't need a JS counterpart. If you're unsure whether a change affects results, it does: mirror it.
Like the JS package, this library stays dependency-free. Integration helpers that need other libraries (pandas DataFrame conversions, database access, ...) belong in the projects that use it, not here.
Each release on GitHub has the wheel attached. Its release notes give the line to put in requirements.txt, with the
wheel's SHA-256 so pip rejects any other file:
retail-calendar @ https://github.com/holonk/retail-calendar-python/releases/download/v1.0.0/retail_calendar-1.0.0-py3-none-any.whl#sha256=...
This needs no git and no build step. To install a release directly:
pip install https://github.com/holonk/retail-calendar-python/releases/download/v1.0.0/retail_calendar-1.0.0-py3-none-any.whlimport datetime as dt
from retail_calendar import (
LastDayOfWeek,
LastMonthOfYear,
RetailCalendarOptions,
WeekCalculation,
WeekGrouping,
get_retail_calendar,
)
options = RetailCalendarOptions(
week_calculation=WeekCalculation.LAST_DAY_NEAREST_EOM,
week_grouping=WeekGrouping.GROUP_454,
last_day_of_week=LastDayOfWeek.SATURDAY,
last_month_of_year=LastMonthOfYear.JANUARY,
) # the same as NRF_CALENDAR_OPTIONS
calendar = get_retail_calendar(options, 2017) # cached; RetailCalendar(options, 2017) builds a new one
calendar.year # 2017, the Gregorian year of the first month
calendar.number_of_weeks # 52 or 53 (53 for 2017)
calendar.first_day # datetime.date(2017, 1, 29)
calendar.last_day # datetime.date(2018, 2, 3)A retail calendar always has 12 months made of whole weeks. Every boundary is a datetime.date, and end dates are
inclusive.
month = calendar.months[0]
month.month_of_year # 1 (counted from beginning_month_index, 1 by default)
month.quarter_of_year # 1 to 4
month.number_of_weeks # 4, 5, 4, ... with 4-5-4 week grouping
month.weeks # tuple of RetailWeek
month.start_date, month.end_date
week = calendar.weeks[0]
week.week_of_year, week.week_of_month, week.week_of_quarter # all 0-based
week.month_of_year, week.quarter_of_year
week.start_date, week.end_date
day = calendar.days[0] # one RetailDay per day of the year
day.date, day.day_of_year, day.day_of_week, day.day_of_month, day.week_of_year, day.month_of_yearConversions between dates and (retail year, 0-based week) segments:
from retail_calendar import DateSegment, date_to_segment, leap_years, segment_to_date, week_of_gregorian_date
date_to_segment(dt.date(2020, 2, 1), options) # DateSegment(year=2019, week=51)
segment_to_date(DateSegment(2019, 51), options) # datetime.date(2020, 1, 26), the first day of that week
leap_years(range(2010, 2030), options) # [2012, 2017, 2023, 2028]
week_of_gregorian_date(dt.date(2020, 2, 1), options) # WeekOfCalendar(calendar=..., week=...)
calendar.week_of(dt.date(2017, 3, 1)) # RetailWeek containing the date
calendar.day_of(dt.date(2017, 3, 1)) # RetailDay of the date
dt.date(2017, 3, 1) in calendar # Truedatetime values (including pandas.Timestamp) are accepted wherever a date is; their time is ignored.
RetailCalendarOptions.from_dict accepts the JS package's keys as well as the alternative names used in stored
configurations and HTTP request bodies (lastDayOfTheWeek, lastMonthOfTheYear, lastWeekCalculationMethod), with
integer or label values. Unrelated keys are ignored.
RetailCalendarOptions.from_dict(
{
"weekGrouping": "4-4-5",
"lastDayOfTheWeek": "Saturday",
"lastMonthOfTheYear": "January",
"lastWeekCalculationMethod": "lastDayNearestEndOfMonth",
"addLeapWeekToMonth": None,
}
)
options.to_dict() # the JS package's camelCase shapeA configuration without a week grouping, week end day or week calculation method (a month-only calendar, for
example) does not describe a retail calendar, so from_dict raises ValueError for it.
A retail calendar has 52 or 53 weeks. By default the 53rd week belongs to no month: its month_of_year,
week_of_month, quarter_of_year and week_of_quarter are None (week.is_leap_week is True), and so are
day_of_month and month_of_year of its days. Its week_of_year is 52.
With add_leap_week_to_month=10, the 53rd week is added to the 11th month instead (the value is 0-based).
| Option | Values |
|---|---|
week_grouping |
GROUP_454, GROUP_544, GROUP_445: weeks per month in each quarter |
last_day_of_week |
MONDAY (1) to SUNDAY (7): the day every week, month and year ends on |
last_month_of_year |
JANUARY (0) to DECEMBER (11). The retail year is the Gregorian year of its first month: with January, retail year 2017 ends in January 2018 |
week_calculation |
How the year end is chosen, below |
add_leap_week_to_month |
None (default) or 0 to 11: the month that gets the 53rd week |
beginning_month_index |
month_of_year of the first month, default 1 |
leap_year, leap_year_end_date, leap_year_frequency |
Required for CUSTOM_LEAP_YEAR |
week_calculation:
LAST_DAY_NEAREST_EOM: the last day of week nearest to the end of the last month (NRF).LAST_DAY_BEFORE_EOM: the last day of week on or before the end of the last month.LAST_DAY_BEFORE_EOM_EXCEPT_LEAP_YEAR: likeLAST_DAY_BEFORE_EOM, but if the next year would have 53 weeks, this year gets them. As in the JS package, this only works for years ending in December; otherwise it behaves exactly likeLAST_DAY_BEFORE_EOM.FIRST_BOW_OF_FIRST_MONTH: the year starts on the first beginning of week of its first month.PENULTIMATE_DAY_OF_WEEK_NEAREST_EOM: weeks end onlast_day_of_week, but year boundaries follow the day before it nearest to the end of month.CUSTOM_LEAP_YEAR:leap_yearends onleap_year_end_date, and everyleap_year_frequency-th year from it has 53 weeks. Withleap_year=2005, leap_year_end_date=date(2006, 3, 11), leap_year_frequency=6, years 2005, 2011, 2017, 2023, ... have 53 weeks.
Supported retail years are 2 to 9997.
| JS | Python |
|---|---|
new RetailCalendarFactory(options, year) |
RetailCalendar(options, year) |
RetailCalendarFactory.getRetailCalendar(options, year) |
get_retail_calendar(options, year) |
weekOfGregorianDate(date, options) |
week_of_gregorian_date(date, options) |
NRFCalendarOptions |
NRF_CALENDAR_OPTIONS |
WeekGrouping.Group454, LastDayOfWeek.Saturday, ... |
WeekGrouping.GROUP_454, LastDayOfWeek.SATURDAY, ... (same integer values) |
WeekCalculation.LastDayNearestEOM, LastDayBeforeEomExceptLeapYear, FirstBOWOfFirstMonth, ... |
LAST_DAY_NEAREST_EOM, LAST_DAY_BEFORE_EOM_EXCEPT_LEAP_YEAR, FIRST_BOW_OF_FIRST_MONTH, ... |
weekOfYear, monthOfYear, ... |
week_of_year, month_of_year, ... |
gregorianStartDate, gregorianEndDate (Date, end at 23:59:59.999) |
start_date, end_date (datetime.date, inclusive) |
day gregorianStartDate |
day.date |
-1 for the 53rd week's month fields |
None |
calendar.addLeapWeekToMonth (-1 when unset) |
calendar.options.add_leap_week_to_month (None when unset) |
leapYearEndDate: "2006-03-11" |
leap_year_end_date=date(2006, 3, 11) (ISO strings are accepted too) |
Differences in behavior:
- No timezone effects. The JS package does its date math in the host's local time, so DST shifts can move a year boundary by a week, depending on where it runs: 9 to 54 of 21,420 tested calendars differ between UTC and other zones. This package works on plain dates and always matches the JS package running in UTC.
- Validation. Invalid options (unknown labels,
add_leap_week_to_monthoutside 0 to 11, missing custom leap year options, unsupported years) raiseValueErrorwhen created instead of failing later or producing wrong calendars. - Immutability. Calendars, weeks, months, days and options are frozen, so the cache can be shared safely.
- Alican Buyukcakir (@abuyukcakir, alican@toolio.com)
- Cihan Cimen (@cihancimen, cihan@toolio.com)
The JS package, holonk/retail-calendar, was written by Cihan Cimen.
uv sync
uv run pytest -n auto # tests, including parity with the JS package
uv run ruff format . && uv run ruff check . && uv run mypy
uv run pre-commit install # optional: run the checks on committests/test_golden.py compares this package with reference data generated from the published JS package (see
tests/data/golden/SOURCE.txt):
- year boundaries of every strategy, week end day and year end month for 1950 to 2060,
- every week, month and day of 576 configurations (all strategies, week groupings and leap week options), for 2000 to 2050 (compared through a digest; full detail for 2023),
- 20,000 random date lookups.
To regenerate it, for example after a change in the JS package:
cd scripts/golden
npm ci
npm run generate # runs in TZ=UTC
./check.sh # or only check that the committed data is up to date (what CI runs)Some fixtures in tests/data are converted from the JS package's tests. The JS fixture for the "last day nearest
EOM, 4-4-5, arbitrary leap year" case had stray spaces in some dates ("2024-01 -08"), which its parser tolerated;
they are fixed here.
-
Bump
versioninpyproject.toml(uv version --bump patch,minorormajor) and merge it tomaster. -
Tag the merge commit and push the tag:
git tag v1.0.1 && git push origin v1.0.1
The release workflow runs CI, checks that the tag matches the version, builds the wheel and sdist and publishes them as
a GitHub Release. Its notes give the requirements.txt line with the wheel's SHA-256. A published version is never
rebuilt or replaced, since projects pin its hash.