Skip to content

Set the NN2 Landreman Newton target above the closed-line rounding floor - #481

Merged
krystophny merged 1 commit into
mainfrom
nn2-rounding-floor-20261127
Nov 27, 2026
Merged

krystophny merged 1 commit into
mainfrom
nn2-rounding-floor-20261127

Conversation

@krystophny

Copy link
Copy Markdown
Member

nonnested_coupled_closed_line_p3 passes again, in 455 s instead of failing after 2548 s. Its Newton target moves from 1e-11 to 1e-10, above the rounding floor of the closed-line rows. The test's gates are unchanged.

At ratio 1e6 the backward errors of the five blocks after the last failed stage on main were:

A multiplier p Phi V
3.2e-13 1.4e-19 9.9e-14 1.0e-11 1.0e-11

The Phi and V rows reach their floor at the 1e-11 target, so each stage exhausted its 12 steps and the continuation halved down to 40 stages and 349 Newton steps.

Things ruled out on faepmac1, all with identical failing output:

  • the builds before the FortSparse pivot pin (#707) and before the LDL^T switch (#563)
  • three sweeps of iterative refinement after every Newton linear solve
  • a fresh direct solve whenever a reused-LU step does not halve the error

Results with target 1e-10 (faepmac1, 4 threads):

target 1e-11 target 1e-10 October sCluster study
stages (Newton steps), nr = 4 / 8 / 16 40 (349), failed 8 (7) / 8 (5) / 8 (3) 8 (7) / 8 (6) / 8 (3)
last-stage backward error 1.0e-11, stalled 2.4e-11 / 5.2e-11 / 2.3e-11
path check A / p / V (gate 1e-6) 6.8e-11 / 5.5e-9 / 9.4e-10 below 2e-7
orders B / p / D3 / V 2.95 / 4.07 / 3.56 / 2.98 2.95 / 4.35 / 3.56 / 2.98

The same target also applies to the other cases of test_nonnested_landreman that use these two continuation calls. The merge queue runs the fast ones.

Chris&AI

At ratio 1e6 the Phi and V rows stop at backward errors of 2e-11 to
5e-11, so the 1e-11 target made every continuation stage of
nonnested_coupled_closed_line_p3 exhaust its steps: 40 stages and 349
Newton steps, then failure after 42 minutes on the hosted runner. With a
target of 1e-10 the case needs 8 stages and 7 steps as in the October
sCluster study and passes every gate in 455 s on faepmac1.
@krystophny
krystophny enabled auto-merge November 27, 2026 20:57
@krystophny
krystophny added this pull request to the merge queue Nov 27, 2026
Merged via the queue into main with commit 300f136 Nov 27, 2026
3 checks passed
@krystophny
krystophny deleted the nn2-rounding-floor-20261127 branch November 27, 2026 21:08
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant