Copy resource quantities before Mul so repeated reconciliation does not inflate PodGroup minResources. Fixes kubeflow#4104 Signed-off-by: DevaanshPathak <devaanshpathak08@gmail.com>
|
[APPROVALNOTIFIER] This PR is NOT APPROVED This pull-request has been approved by: The full list of commands accepted by this bot can be found here. DetailsNeeds approval from an approver in each of these files:Approvers can indicate their approval by writing |
|
Hi @astefanutti, gentle ping for a review and |
abhishekKokadwar
left a comment
There was a problem hiding this comment.
Thanks @DevaanshPathak. The change itself is safe and I think it is worth having, but I could not get the test to demonstrate it, so I looked into why.
The new test passes without the fix
At cb4d7c34, with coscheduling.go reverted to the merge base and the test kept:
| Result | |
|---|---|
| PR head | ok |
coscheduling.go from master, PR test |
ok |
The reason is in Quantity.Mul. Ranging over the ResourceList copies the Quantity struct. For values held as int64Amount, which covers 500m, 1Gi and the other values in the test, Mul only changes the copy. The original is only changed when the quantity is held as inf.Dec, because the copy shares that pointer. So the 1Gi to 2Gi to 4Gi example in #4104 does not happen with those values.
A variant that does pin it
Converting the requests with ToDec() before the loop makes the test fail on master and pass on this branch:
for _, ps := range info.TemplateSpec.PodSets {
for name, q := range ps.SinglePodRequests {
q.ToDec()
ps.SinglePodRequests[name] = q
}
}On master that gives Build mutated PodSet "node" requests, with memory at 2147483648 after the first call and 4294967296 after the second.
Impact
I could not find a path where this shows up in a running controller. RuntimeInfo builds a new Info through runtime.NewInfo on each NewObjects call, and PodRequests deep-copies the quantities, so Build does not see the same Info twice. I read this from the code and did not run a cluster, so please correct me if there is a caller I missed. If that holds, it may be worth rewording the description from "repeated reconciliation inflates minResources" to a hardening change.
Volcano has the same loop
pkg/runtime/framework/plugins/volcano/volcano.go:200 has the identical quantity.Mul(int64(count)) on the range copy. It would make sense to fix both here.
Convert PodSet requests to inf.Dec before Build so Quantity.Mul aliases through the range copy and the test fails without DeepCopy. Signed-off-by: DevaanshPathak <devaanshpathak08@gmail.com>
|
Thanks @abhishekKokadwar — you were right that the original test values stay on the int64 path, so I converted the PodSet requests with On the controller path: I also could not find a caller that reuses the same Still looking for |
abhishekKokadwar
left a comment
There was a problem hiding this comment.
Thanks @DevaanshPathak, the ToDec() change does what it needs to. I checked 487965a:
| Check | Result |
|---|---|
go test ./pkg/runtime/framework/plugins/coscheduling/ on the PR head |
ok |
coscheduling.go from the merge base, with the PR's tests |
TestBuildDoesNotMutatePodSetRequests fails |
go vet on the package, gofmt on both files |
clean |
With the fix reverted, the failure shows exactly the bug from #4104: the node request goes from 1Gi to 2Gi after the first Build and to 4Gi after the second, and the PodGroup minResources changes with it. So the test now pins the change, which it did not before.
On the controller path we agree: NewObjects builds a fresh Info, so this is hardening rather than a live bug. Keeping the DeepCopy makes sense to me for the reason you gave. One small thing: the description still says "Repeated reconciliation no longer inflates PodGroup minResources". Rewording that to say Build no longer mutates the caller's requests, and that no current caller reuses an Info, would match what the test shows and save a reviewer from looking for that path.
I also see the same copy for Volcano is in #4101. Since that PR's title is about HighestTierAllowed, a line in each description pointing at the other might help reviewers find both halves.
The branch is 67 commits behind master but still merges cleanly. The Go unit and integration suite has not run here yet because the PR has no ok-to-test.
Summary
MulinCoScheduling.Build, so the caller's requests stay unchanged.minResources.Fixes #4104
Test plan
go test ./pkg/runtime/framework/plugins/coscheduling/ -count=1 -run TestBuildDoesNotMutatePodSetRequests|TestCoScheduling