Skip to content

epic: pages - Verify and reconcile page content #42

Open
0 of 29 issues completed
Open

Description

@ashleyshaw

Epic Summary

Coordinate page-by-page content verification, reconciliation and Ash’s editorial approval through the existing child issues, preserving metadata and avoiding duplicate editorial work. The file-specific reconciliation scope covers the 11 website-page Markdown files directly under content/pages/. All 17 files under content/pages/about/ remain explicitly excluded. Existing About issues remain unchanged.

Launch-page inclusion, conditional requirements and deferred visibility belong to #410. Connecting approved content to Markdown sources and website templates belongs to #357. This epic does not independently decide launch scope or implement template integration.

Linked Child Issues/Stories/Tasks/PRs

The current hierarchy contains 29 children: the original 11 approved file-specific reconciliation issues and 18 rendered-page capture issues. The original batch covers every in-scope website-page file exactly once; it is not the total child count. The earlier Todo finding applies to that historical batch, not a fresh status assessment of all 29 children.

Existing rendered-page capture includes About Ash in #221. That work covers capture and verification of the rendered page; it does not authorise editing the excluded content/pages/about/ exports or establish approved biography, asset rights or a canonical Markdown source. Map the launch About page to this existing work before proposing additional editorial coverage. No children are required solely for the 17 excluded About exports.

Preserve all existing children, parents and relationships. Capture and file reconciliation are complementary evidence streams, not grounds for automatic deletion, merging or reparenting.

Gear, history and tribes children reference existing editorial verification as dependencies; they do not authorise changes to About files or issues. Issue creation does not establish editorial completion or website publication.

Milestones & Timeline

No deadline or milestone specified for this epic. The original 11 file-specific issue drafts were approved and their issues created; this does not establish approval of their page content. Remaining sequence: verification, approved edits, validation and close-out. Changes to the excluded About-directory exports remain outside scope; existing rendered About Ash capture remains within its own recorded scope.

Acceptance Criteria

  • Every in-scope Markdown file directly under content/pages/ has a linked, file-specific child issue; content/pages/about/ is excluded.
  • Verification, editorial changes and unresolved questions are recorded per file.
  • Metadata, links and applicable content structure are preserved or changed only with approval.
  • All linked stories/tasks completed.
  • Documentation and changelog updated.
  • Tests/QA complete.
  • PR description updated with relevant details.
  • Changelog entry prepared for PR, if applicable.
  • Labels/types match organisation standards.

Dependencies / Blockers

Authoritative sources and author approval are required for disputed facts, sensitive material and incomplete narratives. Confirm application integration before claiming Markdown edits update the website. Resolve schema/path reconciliation for Pages.

Use the launch inventory and approval boundaries recorded in #410 and Book website brief — author decisions and launch scope. For each launch page, identify existing editorial coverage, source revisions, missing content, factual questions, assets, rights and Ash’s approval state. Missing coverage is an unresolved finding, not permission to create duplicate work.

Journal requires at least three approved entries and a clear editorial purpose; Podcast requires at least one approved podcast and a clear purpose. Samples and captured pages do not satisfy those conditions. Keep manuscript selection, editorial approval, integration validation and publication approval distinct.

Do not import portfolio claims, imagery rights or commercial offers without approval. About Ash requires a contact section without a promised response time.

Additional Context

content/pages/

Rights evidence and quotation findings: Book website — Rights-evidence register — Unverified. The register remains Unapproved; all 14 rights states remain Unverified.

Existing files are starting material, not proof of verified content or publication readiness. Reference and structural files receive validation/reconciliation tasks rather than generic article rewrites.

Definition of Ready (DoR)

  • Epic goal and scope defined.
  • Linked stories/tasks listed.
  • Milestones and timeline mapped.
  • Dependencies/blockers identified.
  • Estimate added, if applicable.
  • Stakeholders/approvers listed.

Definition of Done (DoD)

  • Approved by at least one maintainer.
  • All linked stories/tasks completed and closed.
  • Documentation/changelog updated.
  • QA and testing complete.
  • All child issues closed before epic can be closed.
  • Epic updated with latest status before closure.

Activity

  1. linear-code commented on Oct 4, 2026

    @linear-code
  2. added
    priority:important
    status:needs-triage
    on Oct 4, 2026
  3. self-assigned this
    on Oct 4, 2026
  4. 7 remaining items

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

area:coremeta:needs-changelogpriority:importantstatus:needs-triagetype:epic

Type

No type

Fields

Priority

Medium

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions