Skip to content

docs: guide-index - Index the project operational guidance #480

Open

Description

@ashleyshaw

Documentation Update Summary

Prepare one navigable guide index linking actual project procedures, authoritative sources, relevant reusable skills and verified templates. Do not invent documents or claim proposed guides already exist.

Linked Stories/Tasks/PRs/Epic

Proposed parent E. Link D16 guide outputs and relevant D04/D05/D06/D11/D12/D14 artefacts only after their actual locations/revisions exist. No native PR association proposed.

Milestones & Timeline

No dates, milestones or complexity estimates requested.

What documentation is needed?

Use the Guide index document template: purpose/audience, guide navigation, usage, sources/precedence, maintenance and change record. Record actual skill/template identity and limits rather than duplicate their registries.

Why is this documentation important?

Provide a clear starting point for project contributors while distinguishing approved rules, proposed procedures and unresolved responsibilities.

Acceptance Criteria

  • Documentation is clear, accurate, and up-to-date
  • Includes code examples/screenshots if applicable
  • Documentation is accessible and easy to find
  • Changelog entry prepared for PR if user-facing update
  • PR uses correct branch prefix (docs/)
  • PR description updated with relevant details
  • Changelog entry prepared for PR (if applicable)
  • Labels/types match org standards

Additional Context

No dedicated guide-index authoring skill was verified. Use the live template and verified records; potential general documentation support is a recommendation, not an invoked or invented specialist. Preserve the engineering checklists with applicability explicit: no application code or changelog edit is authorised by issue creation; PR completion/deletion/closure are separately authorised future actions.

Definition of Ready (DoR)

  • Documentation need is clear and well-defined
  • Related docs/issues or files linked
  • Acceptance criteria listed
  • Estimate added if relevant
  • Milestone/release assigned (if applicable)

Definition of Done (DoD)

  • Documentation meets org standards and guidelines
  • Changelog entry prepared for PR (CHANGELOG.md)
  • Documentation reviewed for clarity and accessibility
  • Screenshots/code examples included if relevant
  • PR uses correct branch prefix (docs/)
  • PR uses the correct PR template based on type:docs PR label or linked issue type or linked issue type:docs label
  • Branch deleted after merge
  • Linked issue(s) updated with latest status and closed after merge,
  • The related epic should not be closed, instead updated with a comment to reflect the closed issue

Publication, revision and approval boundaries

Prepare the artefact in Linear and as version-controlled GitHub documentation. Proposed Linear parent: This One Time on Acid — book. Before authoring, reuse an existing authoritative artefact where one covers this scope; surface any overlap for review rather than create a competing baseline.

Record both locations, exact repository commit, document revision, inspected source extent, review state and approval evidence. Link the reviewed Linear revision to the corresponding GitHub revision and record parity or divergence explicitly. Cross-links do not imply automatic synchronisation, matching deployments or integration isolation. Linear-only classifications must not be exported to GitHub.

Repository baseline reviewed for this proposal: develop at 6b3b76baa955acdfaee0d5e4aef39e099b4b083e; this is source evidence, not current deployment or passing-test evidence. Use repository-owned AGENTS.md, CONTRIBUTING.md and the guidelines/ reading order; re-read before authoring. React/TypeScript/Vite evidence does not justify WordPress assumptions.

Owner-reported environments: Netlify deployment and current Figma Make live site. Their revisions, parity and production-readiness status are not established here. No runtime checks, vendor pricing research, tests, document publication or implementation were performed by drafting this issue.

All checklists remain unchecked. Checks not executed are Not run; genuine non-applicability needs a reason. Preparation, review approval, contractual effect, operational execution, client acceptance and release/deployment authorisation remain separate. No ownership, dates, estimates, prices, limits or accepted decisions are invented. Approval of this issue-creation pack does not authorise documents, skills, templates, branches, PRs, tests, service changes or deployment.

Branch instructions

  • Repository: lightspeedwp/ThisOneTimeOnAcidCom
  • Implementing issue(s): This proposed child only; no existing issue identifier assigned.
  • Parent epic context: E, local draft reference only; never a PR development or closing target.
  • Allowed closing target(s): None proposed; verify the created implementing child and whole-outcome completion before any later association.
  • Branch state: unresolved.
  • Branch: unresolved — exact recommendation withheld pending current branch/PR scope checks and organisation-policy comparison.
  • Base: develop is documented in CONTRIBUTING.md and docs/BRANCH_NAMING_LOCAL.md at the reviewed SHA; reverify before any branch operation.
  • Naming policy: documentation changes use authorised docs/ and {type}/{scope}-{title} under scripts/validate-branch-name.js; issue type does not determine branch prefix.
  • Pull request template: Shared Documentation template is documented; exact current shared path/content and routing remain to be verified. Automatic PR-body insertion is not established.
  • Constraints: Draft only. Preserve unrelated changes and protected files; do not force-push, merge, deploy, modify application code or execute tests.
  • Conflicts or missing evidence: Existing relevant branch/PR scope, current organisation policy, final artefact destinations/configuration and exact shared PR-template source need verification. AGENTS.md has older branch-template uncertainty; use the more specific inspected CONTRIBUTING/local guide while reporting conflicts.

Expected file changes

Plan status: provisional, bounded documentation-only proposal. Paths below were absent at the reviewed SHA; inspect the latest tree and existing authority before authoring. Filename/directory proposals do not adopt ADR numbering or supersede guidelines.

Operation Path(s) Intended change Path evidence/revision Approval or dependency
Create docs/project-suite/guide-index.md Prepare the scoped review artefact; no product implementation Proposed path; absent at reviewed SHA 6b3b76baa955acdfaee0d5e4aef39e099b4b083e Separate exact document/repository-write approval; inspect existing authority first
  • Out of scope: application/test code, infrastructure, workflows, protected configuration, executed QA and production operations.
  • Remaining discovery: inspect existing authoritative artefacts/configuration and current branch/PR scope within this child’s documented topic; return changed destinations/scope for approval.
  • Scope-change gate: Stop for revised scope and approval before adding materially different files or operations.

Evidence and handoff packet

  • Recipient and request: issue-creator; exact description preview only, no implicit implementation invocation.
  • Selected record: D15 in this unsaved approval pack.
  • Implementing targets and criteria: this child’s bounded preparation outcome and preserved acceptance criteria; no target exists yet.
  • Sources checked: current Linear template and project scope; repository instructions/local branch guide/validator at the reviewed SHA; vendor roles are owner-proposed, not verified decisions.
  • Branch/PR evidence: no verified relevant branch/PR scope fit; no reuse or exact new branch recommended.
  • Association and closing rationale: no current native PR/closing target; epic completion requires a separate human decision.
  • Unresolved points and exclusions: current organisation policy, shared PR template, relevant branches/PRs, source authority and review responsibility; no implementation/operation approval.
  • Approval state: issue-creation draft only; subsequent artefact or repository writes need separate exact preview and approval.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:coremeta:no-changelogpriority:minorstatus:needs-triagetype:docs

    Type

    No type

    Fields

    Priority

    Low

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions