style: reformat the fork's code for ruff at line-length 88 - #4
Merged
Merged
Conversation
Upstream lilab-bcb#234 replaced black (line-length 100) with ruff (88). The fork's topic branches were written before that switch and never reformatted, so every file the fork touches was over the new limit -- which is what has been failing pre-commit.ci on the upstream PRs. Formatting only: 6 files reformatted, 2 I001 import-sort fixes. No logic changes. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01BQnnW5jCKXnefXA89eBDoL
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Formatting only — no logic changes.
Upstream lilab-bcb#234 replaced black (line-length 100) with ruff (88). Our topic branches predate that
switch and were never reformatted, so every file the fork touches sits over the new limit. That
is what has been failing
pre-commit.cion the six upstream PRs — a real failure on our diffs,not an artifact of upstream's installation.
pre-commit run --all-files: 6 files reformatted, 2I001import-sort fixes. A second run isclean across every hook.