Skip to content

Harden continuity projections and role-holder updates - #4

Merged
souravC01 merged 9 commits into
mainfrom
feat/custom-workspace-mitigation-loop
Aug 20, 2026
Merged

souravC01 merged 9 commits into
mainfrom
feat/custom-workspace-mitigation-loop

Conversation

@souravC01

Copy link
Copy Markdown
Owner

Summary

  • make impact-engine results authoritative for draft continuity projections
  • synchronize complete role-holder sets atomically
  • harden consistency under concurrent reads and asynchronous UI loading

Context

The organization-wide simulation PR merged before these architecture changes reached the feature branch. This follow-up carries only the remaining verified commits into main.

Validation

  • backend: full Maven suite — 31 tests passed
  • frontend: 13 tests passed
  • frontend lint passed
  • frontend production build passed
  • git diff --check passed

Risk and rollback

The affected boundaries have unit, integration, concurrency, and frontend request-contract coverage. There are no database migrations. Rollback is a normal revert of this PR.

@souravC01
souravC01 merged commit 3f2ceb1 into main Aug 20, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant