docs: integration readiness and blocked merge-train evidence - #15

Open
JordanD120 wants to merge 2 commits into
codex/m9-acceptance-hardeningfrom
codex/integration-readiness-review
Open

JordanD120 wants to merge 2 commits into
codex/m9-acceptance-hardeningfrom
codex/integration-readiness-review

Conversation

@JordanD120

@JordanD120 JordanD120 commented Nov 17, 2026 •

Copy link
Copy Markdown
Collaborator

Records the M9 host-only verdict and readiness package from commit 551ff294afff39c2237bb7a2bd9ca4addb5109f8, plus actual integration results and read-only Pi inventory. Documentation-only head: 98d209517a47556de31b80e616f8ca93f4f81414.

Integration is BLOCKED. Explicitly authorized merge commits #5 through #11 completed with verified parents/source-identical trees and preserved branches. Current main is 713800931a5926abd8c9c5d57669c124c54dac42 (accepted M6 tree). Its main CI failed at the unchanged M4 paused-summary wait; server output includes workflow HTTP 409. Cause is not conclusively proven. No failed-run retry, timeout/assertion change, rollback or later retarget/merge occurred. #12 through #14 remain open on their original feature bases.

This PR targets codex/m9-acceptance-hardening so only documentation is proposed. Do not merge it or resume the train without explicit failure disposition. Start with execution report and failure findings. Exact stage SHAs, trees, rollback checkpoints, CI IDs, remaining PR refs and checksum-verified failure artifact manifest are included.

The separate full M9-tree rehearsal passed 264 tracked checks (two Windows symlink skips covered by POSIX CI), actual-sketch C++, seven Chromium workflows, nine preserved root-app tests, and 72 accelerated synthetic hours in 116.228921300004 real seconds. That rehearsal does not erase the failed intermediate-main CI or establish physical readiness. REL-01 and REL-02 remain open.

Pi inventory only: Pi 4 / Debian 13 aarch64 / Python 3.13.5; no Arduino detected and camera enumeration reports no cameras. Existing HMI and GPIO4 helper remain untouched. No backup, installation, service change or hardware activation occurred. Prepared isolated synthetic installation still requires specific target backup/install approval. Physical boundary proposal, 40-SR owner checklist, rollback and approval gates remain for review; provisional requirements, pins/polarity, crop/model, security, retention and validation gates are unresolved.

All 15 original hashes and seven untracked root entries are preserved. No runtime source, gateway, Gantt status, production access, historical data or retention automation changes.

Documentation head CI passed on both PR run 43985866535 and push run 43985800089. These M9-based documentation checks do not supersede or retry the failed intermediate-main gate. Main remains stopped at 713800931a5926abd8c9c5d57669c124c54dac42.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant