Repository navigation
Site currency: record Stage 7 built and the spine gate passed - #63
Merged
Merged
Conversation
The welcome surfaces under-reported (DEC-28 cuts both ways): status.yml still showed Stage 7 not-started and gate_passed false, and the Home hero badge said 'Stage 6 built · Stage 7 next', while Stage 7 has been built and demonstrated and the SPEC-15 gate harness (tests/gate.test.ts, G1-G6 + oracles) runs green in CI. Corrected together (build-site.ts asserts the label match): stage 7 done, gate_passed true, badge 'All stages built · gate passed', SPEC-15 status line updated, and an updates entry recording the correction. No capability change. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01KDyxuuZBzWNZ2YWxXhiJ3x
|
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
The welcome surfaces under-reported what the repository contains (DEC-28's currency rule cuts both ways):
docs/status.ymlstill showed Stage 7not-startedandgate_passed: false, and the Home hero badge said "Stage 6 built · Stage 7 next" — while Stage 7 (surfaces & narratives) has been built and demonstrated, and the SPEC-15 spine-complete gate harness (tests/gate.test.ts, asserting G1–G6 end-to-end on Meridian plus the §9 oracles) has been implemented and green in CI since it landed. This PR brings the site's claims into line with the repository.Slices
None — housekeeping/currency correction (same class as PRs #59/#62), not a spec-kit slice.
Register impact
No new register decision. Applies DEC-28 (home-page currency) and the status.yml honesty guardrails; a dated
updatesentry records the correction itself.How to review
1. Quick check
scripts/build-site.tsruns clean — the build-time assertion thatcurrent_stage_labelmatches the Home hero passes (the two files change together)2. Walk the change
docs/status.yml:updated→ 2026-07-18; stage 7 →done;gate_passed→true(with the harness cited); badge label → "All stages built · gate passed"; a new updates entry records the correction in both directions of honesty.docs/assay-home.html: hero badge updated to match (asserted at build time).specs/015-gate/spec.md: status line Draft → Built, citing the shipped harness and the recorded pass date.3. Blog article
Not applicable.
Honesty checklist
tests/gate.test.ts, the built Stage-7 surfaces)Test plan
npx tsx scripts/build-site.ts— passes, label assertion satisfied🤖 Generated with Claude Code
https://claude.ai/code/session_01KDyxuuZBzWNZ2YWxXhiJ3x
Generated by Claude Code