Skip to content

Site currency: record Stage 7 built and the spine gate passed - #63

Merged
IanMayo merged 1 commit into
mainfrom
claude/jipoe-c2-process-review-g4kwfn
Jul 18, 2026
Merged

IanMayo merged 1 commit into
mainfrom
claude/jipoe-c2-process-review-g4kwfn

Conversation

@IanMayo

@IanMayo IanMayo commented Jul 18, 2026

Copy link
Copy Markdown
Contributor

Summary

The welcome surfaces under-reported what the repository contains (DEC-28's currency rule cuts both ways): docs/status.yml still showed Stage 7 not-started and gate_passed: false, and the Home hero badge said "Stage 6 built · Stage 7 next" — while Stage 7 (surfaces & narratives) has been built and demonstrated, and the SPEC-15 spine-complete gate harness (tests/gate.test.ts, asserting G1–G6 end-to-end on Meridian plus the §9 oracles) has been implemented and green in CI since it landed. This PR brings the site's claims into line with the repository.

Slices

None — housekeeping/currency correction (same class as PRs #59/#62), not a spec-kit slice.

Register impact

No new register decision. Applies DEC-28 (home-page currency) and the status.yml honesty guardrails; a dated updates entry records the correction itself.

How to review

1. Quick check

  • scripts/build-site.ts runs clean — the build-time assertion that current_stage_label matches the Home hero passes (the two files change together)
  • No unbanded scalars from assessed sources (G2) — n/a, status metadata only

2. Walk the change

  1. docs/status.yml: updated → 2026-07-18; stage 7 → done; gate_passed → true (with the harness cited); badge label → "All stages built · gate passed"; a new updates entry records the correction in both directions of honesty.
  2. docs/assay-home.html: hero badge updated to match (asserted at build time).
  3. specs/015-gate/spec.md: status line Draft → Built, citing the shipped harness and the recorded pass date.

3. Blog article

Not applicable.

Honesty checklist

  • Nothing shown as done that the repository does not contain — each corrected claim cites its evidence (tests/gate.test.ts, the built Stage-7 surfaces)
  • The correction is itself recorded in the updates feed, not applied silently
  • Frozen identifiers unchanged

Test plan

  • npx tsx scripts/build-site.ts — passes, label assertion satisfied
  • Docs/metadata only; no runtime surface affected

🤖 Generated with Claude Code

https://claude.ai/code/session_01KDyxuuZBzWNZ2YWxXhiJ3x


Generated by Claude Code

The welcome surfaces under-reported (DEC-28 cuts both ways): status.yml
still showed Stage 7 not-started and gate_passed false, and the Home hero
badge said 'Stage 6 built · Stage 7 next', while Stage 7 has been built
and demonstrated and the SPEC-15 gate harness (tests/gate.test.ts,
G1-G6 + oracles) runs green in CI. Corrected together (build-site.ts
asserts the label match): stage 7 done, gate_passed true, badge 'All
stages built · gate passed', SPEC-15 status line updated, and an updates
entry recording the correction. No capability change.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01KDyxuuZBzWNZ2YWxXhiJ3x
@github-actions

github-actions Bot commented Jul 18, 2026 •

Copy link
Copy Markdown
PR Preview Action v1.8.1
Preview removed because the pull request was closed.
2026-07-18 12:30 UTC

@IanMayo
IanMayo merged commit fb765e3 into main Jul 18, 2026
3 checks passed
@IanMayo
IanMayo deleted the claude/jipoe-c2-process-review-g4kwfn branch July 18, 2026 12:30
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants