Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion docs/assay-home.html
Original file line number Diff line number Diff line change
Expand Up @@ -236,7 +236,7 @@
<header class="hero">
<div class="wrap hero-inner">
<div class="tags">
<span class="tag is-stage">Stage 6 built · Stage 7 next</span>
<span class="tag is-stage">All stages built · gate passed</span>
<span class="tag is-demo">Demonstrator, not a product</span>
<span class="tag">Meridian Archipelago — engineered fiction</span>
</div>
Expand Down
18 changes: 14 additions & 4 deletions docs/status.yml
Original file line number Diff line number Diff line change
Expand Up @@ -13,10 +13,10 @@
# the site polices its own optimism rather than trusting a human to.
# - Nothing here may show a capability the repository does not contain.

updated: 2026-07-16
updated: 2026-07-18
current_stage: 7 # 0..7, the stage in flight
current_stage_label: "Stage 6 built · Stage 7 next"
gate_passed: false # the spine-complete gate (SPEC-15)
current_stage_label: "All stages built · gate passed"
gate_passed: true # the spine-complete gate (SPEC-15) — tests/gate.test.ts, green in CI

stages:
- id: 0
Expand Down Expand Up @@ -64,7 +64,7 @@ stages:
- id: 7
name: Surfaces & narratives
blurb: role bundles + five narrative scripts (post-gate)
status: not-started
status: done
research_note: docs/research/09-narratives.md
research_published: true

Expand Down Expand Up @@ -97,6 +97,16 @@ theses: # state vocabulary is the register's own
# The dated updates feed — newest first. A milestone entry may stay a one-liner
# or grow into a full blog article (see `blog:` below and comms plan §6/§9).
updates:
- date: 2026-07-18
note: >-
Site-currency correction (DEC-28 — under-reporting is drift too): the stage tracker and Home
badge still said "Stage 6 built · Stage 7 next" and gate_passed: false, while Stage 7
(surfaces & narratives, SPEC-16/17 — since rebuilt on the SPEC-26 replay mechanism) has been
built and demonstrated, and the SPEC-15 spine-complete gate harness (tests/gate.test.ts,
asserting G1–G6 end-to-end on Meridian plus the vignette §9 oracles) has been implemented and
green in CI since it landed. Corrected: stage 7 done, gate_passed true, badge "All stages
built · gate passed"; the SPEC-15 spec status line updated to match. No capability change —
this entry records the site catching up with the repository, in both directions of honesty.
- date: 2026-07-18
note: >-
Register batch 9 ratified (ASSAY-DEC-48/49/50, closing concept §6.30/§6.31/§6.35) — the
Expand Down
2 changes: 1 addition & 1 deletion specs/015-gate/spec.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,7 @@

**Created**: 2026-07-14

**Status**: Draft
**Status**: Built — the gate harness ships as `tests/gate.test.ts` (asserts G1–G6 end-to-end on Meridian, re-asserts the vignette §9 oracle cases O-1…O-4, confirms theses A–F walkable) and runs green in CI; recorded as passed in `docs/status.yml` (`gate_passed: true`, 2026-07-18)

**Input**: SPEC-15 — Spine-complete gate harness; the single barrier before Stage 7.

Expand Down
Loading