Skip to content

docs: record governed PTY observation before the reap - #32

Merged
novelKR merged 1 commit into
mainfrom
claude/project-thread-af6ntg
Oct 12, 2026
Merged

novelKR merged 1 commit into
mainfrom
claude/project-thread-af6ntg

Conversation

@novelKR

@novelKR novelKR commented Oct 12, 2026 •

Copy link
Copy Markdown
Owner

Updates the CS-RG plan's dated note now that governed PTY executions are observed before the reap. It is bookkeeping, the same kind of change as #31.

Why

#31 recorded CSRG-U5 as merged and noted that, until a separate Codex change lands, U5 observes PTY executions only after Codex reaps them, as the owner chose on 2026-10-11 (option 3). That change has now landed in CodeSpace, each PR merged at its exact head on the owner's approval:

PR Exact head Merge commit
novelKR/CodeSpace#93, the Codex PTY pre-reap observer as a recorded patch on the official rust-v0.154.0 pin a75d030 3d051fa, 2026-10-11
novelKR/CodeSpace#95, governed PTY executions observed before the reap through that patch 634a19f 181a020, 2026-10-12

novelKR/CodeSpace#95's CI on 634a19f passed all 17 jobs. Post-merge on CodeSpace main at 181a020: CI run 38205025558 passed all 17 jobs, and documentation run 38205025983 passed. Neither PR changes a pin, so CodeSpace still links this repository at 6e7e065; novelKR/CodeSpace#95's tests use this repository's fixture authority as it is at that commit (pause_reconciler, hold_authority).

Changes

File Change
docs/planning/milestones/CS-RG.md, docs/ko/planning/milestones/CS-RG.md The dated current-state note is dated 2026-10-12 and says that governed PTY executions are now observed before the reap, as governed pipe executions are, through the recorded patch (novelKR/CodeSpace#93 and novelKR/CodeSpace#95), as the owner chose on 2026-10-11, and that U5 observed them only after Codex's reap until then
docs/translations.json planning-milestones-cs-rg hashes recorded with scripts/check_docs.py record after reviewing the Korean counterpart

What does not change

  • The units ledger in milestones.json: U5 stays merged-verified, U6 not-started, CS-RG in-progress with qualification not-run.
  • The other dated notes (AGENTS.md, docs/milestones.md, the planning index) say nothing about PTY observation and stay as docs: record CSRG-U5 as merged #31 left them.
  • The suspension of the CSRG-C00–C09 plan stays in force, and no historical text is rewritten.
  • No product code, contract, pin, dependency, CI policy or test changes. The DG-1 qualified release stays 0.1.0-5daee5d-b3fa569e.

Verification

At 0c43653, based on main at cd0681c:

  • python3 scripts/ci_plan.py --base origin/main --head HEAD: profile affected, 3 normative paths, stages whitespace and documentation, no Rust.
  • python3 scripts/validate.py --stages whitespace,source-contract,documentation,protocol-analysis --diff-base origin/main: all four passed.
  • python3 scripts/check_docs.py: passed, 18 reviewed pairs, 48 work units, 25 logical PR groups.

Rollback

Revert the merge (git revert -m 1 <merge commit>). The note would then say again that PTY executions are observed only after Codex's reap, which is no longer true.

…n note)

CodeSpace merged novelKR/CodeSpace#95 on 2026-10-12 (main 181a020): the
recorded patch on the pinned Codex (novelKR/CodeSpace#93) now gives a
governed PTY root the same observation before the reap as a governed pipe
root, completing the PTY option the owner chose on 2026-10-11. The CS-RG
plan's dated current-state note said that until a separate Codex change
lands, U5 observes PTY executions only after Codex reaps them. Date the
note 2026-10-12 and say what holds now, English and Korean. The units
ledger is unchanged: U5 stays merged-verified, U6 not started, CS-RG
in-progress with qualification not-run. Korean counterpart reviewed;
planning-milestones-cs-rg hashes recorded.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
@novelKR
novelKR merged commit 152a2cf into main Oct 12, 2026
4 checks passed
novelKR pushed a commit that referenced this pull request Oct 12, 2026
The owner directed CSRG-U6 to start on 2026-10-12, after CSRG-U5 merged
in CodeSpace as novelKR/CodeSpace#92 (0c21a7f), recorded here by #31,
and governed PTY executions came to be observed before the reap through
novelKR/CodeSpace#93 and novelKR/CodeSpace#95, recorded by #32. Record
U6 as active with the units dated 2026-10-12, and say so in AGENTS.md,
the milestone table and note, the planning index and the CS-RG plan,
English and Korean. CS-RG stays in-progress with qualification not-run,
DG-1's qualified release is unchanged, and the suspension of the
CSRG-C00-C09 plan is unchanged. Korean counterparts reviewed;
planning-readme and planning-milestones-cs-rg hashes recorded.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants