You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Calendar factories for DateRange (month, quarter, year, week) #48
Factories for the calendar ranges people build by hand most often: a month, a quarter, a year, an ISO week.
// names are a sketchDateRange.Month(2026,10);// [2026-10-01,2026-11-01)DateRange.Quarter(2026,4);// [2026-10-01,2027-01-01)
Deferred from 9.0.0. The names and the week rule (ISO 8601, or the current culture's first day of week) are hard to change later, so settle them before shipping. NodaTime's LocalDateRange and YearMonthRange probably want the same set.
Moved off 9.1.0 into the backlog (#83), with no milestone.
release/9.x has been cut, and 9.1.0 ships with the work that's already finished. Nothing has started on this issue, and it shouldn't hold up the tag. This is an addition, so the 10.0.0 epic (#58) doesn't take it either: that epic is kept to the silent and breaking fixes so they aren't held up behind new features.
When someone picks it up, it goes under the epic of the release it will ship in and takes that milestone. A 9.x minor would need the change cherry-picked onto release/9.x.
Activity
CaffeinatedCoder commentedon Oct 17, 2026
Moved off 9.1.0 into the backlog (#83), with no milestone.
release/9.xhas been cut, and 9.1.0 ships with the work that's already finished. Nothing has started on this issue, and it shouldn't hold up the tag. This is an addition, so the 10.0.0 epic (#58) doesn't take it either: that epic is kept to thesilentandbreakingfixes so they aren't held up behind new features.When someone picks it up, it goes under the epic of the release it will ship in and takes that milestone. A 9.x minor would need the change cherry-picked onto
release/9.x.