Repository navigation
ledger: t27b rows for sar_cdac and spice_convert, UNLISTED 12 -> 0 (Closes #10615) - #10616
Merged
Merged
Conversation
specs/analog/sar_cdac.t27 and specs/tools/t27o/spice_convert.t27 reached master after the steward ledger PR #10595 was cut, so t27b-native-ratchet reports them UNLISTED on every open PR. Both rows carry the verdict the ratchet itself measured on run 39158125980: the reference passes them, t27b pass. The branch is #10595's commit plus a merge of master, so this PR and #10595 merge in either order. No cap change. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This was referenced Oct 18, 2026
Closed
Merged
gHashTag
enabled auto-merge (squash)
October 18, 2026 20:07
Contributor
This was referenced Oct 18, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Closes #10615
What
Two rows in
docs/reports/t27b_expectations.json:specs/analog/sar_cdac.t27:passspecs/tools/t27o/spice_convert.t27:passBoth verdicts come from the ratchet's own measurement on run 39158125980 ("the reference passes it", t27b pass). Neither is a guess.
Why
t27b-native-ratchetis red on every open PR with UNLISTED 12. #10595 adds 10 of those rows. These two specs landed on master after #10595 was cut.Merge order
This branch is #10595's commit (574444b) plus a merge of master. It therefore merges cleanly before #10595, after it, or on its own. If it merges first, #10595 becomes a no-op. The cap is unchanged.
Expected
The ratchet on this PR reports UNEXPECTED FAILURE 0, UNLISTED 0, STALE 0 and OVER CAP 0.
🤖 Generated with Claude Code